Arboricultural impact assessment: what councils ask it to contain

An arboricultural impact assessment overlays the proposed development on the tree survey and weighs every effect on the trees. Leeds lists the topics it must cover, and councils in Australia and Canada ask for their own versions.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

An arboricultural impact assessment, called an AIA, is the report that sets a design against the trees on and beside a site. UK councils name it in their validation lists, usually next to a tree survey, a tree protection plan and a method statement. Councils in Victoria, New South Wales and British Columbia have their own forms of it.

How it differs from the tree survey

Bassetlaw District Council lists what a tree survey holds: a schedule of species, trunk diameters, spread, heights, condition, defects and root protection areas, a scaled tree constraints plan, photographs, a pre-development tree works schedule and a protection scheme. The survey records the trees. The AIA records what the development does to them.

Leeds City Council reproduces Table B.1 from BS 5837. It puts the tree survey at pre-application and the arboricultural impact assessment at the planning application. The AIA sits alongside the finalised retention and removal plan, the tree protection plan and the heads of terms of a method statement. Leeds describes the AIA as the development proposals overlaid on the tree survey plan to analyse all impacts, including any incursion into the root protection areas of retained trees.

AIA contents in UK validation guidance

Leeds says the AIA must analyse:

  • trees for removal, kept apart as those removed for health reasons (category U) and those removed to allow the development
  • the drainage strategy and services
  • level changes, with illustrative cross sections
  • retaining walls
  • construction needs: scaffolding and mobile platforms, working space, access and storage
  • facilitation pruning
  • sight line needs on the highway

It adds a clear illustrative plan cross-referenced to the text. Trees protected by a tree preservation order are marked on every layout. Leeds also states a default construction stand-off of 5 m to the larger of tree canopies and root protection areas, and does not accept lopping back canopies to find that space.

Slough Borough Council lists a survey, an AIA, an AMS and a tree protection plan on its validation list for any application with trees within or at the edge of the site, householder applications included. The reports come from a qualified arboriculturist with professional indemnity insurance, and trees over 75 mm in diameter within influencing distance are surveyed.

Versions outside the UK

Council Arboriculture Victoria, with the Victorian Tree Industry Organisation, wrote a reporting guideline for AIAs prepared with AS 4970-2009 in mind. It calls the AIA a procedure for determining the viability of retained trees at the design and review stage. Its outline runs:

  • title page and an executive summary of up to about 150 words
  • introduction and methodology, including inspection dates, with the report written within six months of the inspection
  • observations, discussion, conclusions and recommendations
  • references, appendices and a glossary

The guideline adds that a council may return an AIA with inaccurate data, or one that does not deal with protection zone encroachments, and require a new one.

North Sydney Council asks for an AIA where work falls inside a tree's notional root zone. The report identifies the likely impacts, justifies removals, sets out ways to limit damage and quantifies the NRZ, the structural root zone, the tree protection zone and the percentage of encroachment. It attaches the protection specification and plan. These terms are compared in the guide to protection zone terms.

The District of Saanich in British Columbia asks for a Tree Management Plan from an ISA-certified arborist when protected trees, or off-site trees, could be affected. It carries a tree inventory, protected root zone calculations, retention or removal for each tree and mitigation measures. Off-site bylaw trees with a drip line within 4 m of the work are included.