ArbNation Join free

Before a tree is cut: which office's rules apply, by country

Four official offices set rules that can apply before a tree comes down: a forestry body, a planning authority, a wildlife agency and a council. This runs through England, Canada, the United States and New South Wales.

Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Official pages name different offices for the same tree. Where more than one applies, the rules stack: a felling licence, a protection order and a bird law can each reach the same job.

England: Forestry Commission, then the planning authority

The Forestry Commission's guidance says a felling licence is needed to fell any growing trees in England, unless an exemption applies. Licences are free. The threshold is an over-bark diameter of 8 cm or more (15 cm for coppice or underwood), measured at 1.3 m above ground. Above those sizes, a licence is needed to fell more than 5 cubic metres in a calendar quarter, and no more than 2 of those 5 cubic metres can be sold.

Felling without a licence, where one was required, is an offence. Everyone involved can be prosecuted, and the guidance names landowners, tenants, agents, timber merchants and contractors. Anyone claiming an exception has to prove it with records such as photos, maps, surveys and permissions. Other consents can apply even where no licence is needed, for example on a site of special scientific interest.

A second layer sits with the local planning authority. Its Tree Preservation Order prohibits cutting down, topping, lopping, uprooting, wilful damage and wilful destruction without the authority's written consent. The government's planning guidance adds that cutting roots is also prohibited in the Secretary of State's view. Trees in a conservation area that have no Order are covered by section 211 of the Town and Country Planning Act 1990. Anyone planning certain work gives the authority 6 weeks' notice.

Protected-tree rules in the England planning guidance
ItemWhat the guidance records
Section 211 notice6 weeks before work on a conservation area tree with no Order. Work may start sooner if the authority consents.
Size exemptionNo notice for a tree 75 mm or less in diameter, or 100 mm or less if cut only to improve the growth of other trees. Diameter is measured over the bark at 1.5 m above ground.
Dead trees under an Order5 working days' written notice before work, unless the work is urgent. No consent is needed.
Immediate risk of serious harmWritten notice to the authority as soon as practicable after the work becomes necessary.
PenaltyA fine of up to £20,000 in the magistrates' court, and an unlimited fine in the Crown Court in serious cases.

Canada: nesting periods

Environment and Climate Change Canada estimates when nesting is most likely for most migratory birds. In Canada the general nesting period may start as early as mid-March and run until late August. It starts with the first egg-laying and ends when the young have left the nest area. Zone A1, in open habitat, is predicted to run from March 30 to August 16. Zone N10 runs from late May to mid-August.

The department says predictions can be off by 10 days or more. Active nests are unlikely outside the period, but the chance is much lower, not zero. The dates do not authorize harming birds or disturbing nests or eggs, and users stay responsible for following the law and permit conditions.

United States: the Migratory Bird Treaty Act

The US Fish and Wildlife Service describes the Act as prohibiting the take of protected migratory birds, including killing, capturing, selling, trading and transport, unless the Service has approved it in advance. The Act carries out four treaties, with Canada, Mexico, Japan and Russia. It covers only migratory species native to the United States or its territories. The statute is 16 U.S.C. 703 to 712.

New South Wales: one council's permit rules

Northern Beaches Council says trees on private land there are protected under Chapter 2 of the State Environmental Planning Policy (Biodiversity and Conservation) 2021. Tree work not tied to a development application needs a Council permit, with listed exceptions. Among the exceptions the Council lists:

  • a tree within two metres of an existing approved building, measured from the building to the trunk base;
  • a dead tree that is not habitat for native animals;
  • a tree certified as an imminent danger and high risk by an AQF Level 5 arborist or equivalent, with a copy of the report sent to Council;
  • pruning of up to 10 percent of a canopy within 12 months, to Australian Standard AS 4373-2007.

A permit is required for a heritage item, a tree in a heritage conservation area, a threatened species, and a tree kept as a condition of development consent. A permit lasts 12 months from issue. Properties on the NSW Biodiversity Values Map may need a permit from the Native Vegetation Panel instead.

Sources