Contractor licence for tree work in South Carolina: the US$10,000 and US$5,000 licence lines

South Carolina licenses general and mechanical contractors above US$10,000 of total construction cost, a line raised from US$5,000 in 2023. The statute and the board's pages name no tree work.

Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. The statute is the South Carolina Code of Laws, Title 40, chapter 11. The regulator is the South Carolina Contractors' Licensing Board, part of the Department of Labor, Licensing and Regulation (LLR). Act 69 of 2023 (H.4115), effective May 19, 2023, rewrote the licence thresholds and classifications.

At a glance

South Carolina contractor licence lines
ItemOfficial wording
Licence lineTotal cost of construction greater than US$10,000, general or mechanical (section 40-11-30)
Earlier lineUS$5,000, replaced by Act 69 of 2023
PenaltyMisdemeanor: up to one year in prison or a fine up to US$5,000 (section 40-11-200)
RegulatorContractors' Licensing Board, LLR

The licensing requirement

Section 40-11-30 bars any entity or individual from practising as a contractor without a licence. The bar applies to contracting work, performed or offered, where the total cost of construction is greater than US$10,000 for general contracting or for mechanical contracting. Act 69 substituted "ten thousand dollars" for "five thousand dollars" in both places. The LLR's frequently asked questions page confirms the change, from US$5,000 to greater than US$10,000.

Section 40-11-20 defines general construction as the installation, replacement or repair of a building, structure, highway, sewer, grading, asphalt or concrete paving, or improvement of any kind to real property. The total cost of construction is the actual cost incurred by the owner, all contractors, subcontractors and other parties for labor, material, equipment, profit and incidental expenses for the whole project. Design services are left out unless they are in the construction contract.

Section 40-11-300 makes it unlawful for an owner, construction manager, prime contractor or other entity with hiring authority to divide work into portions so as to avoid the chapter's requirements. The total cost of construction decides the licence group.

Penalty

Section 40-11-200 makes practising or offering to practise in violation of the chapter a misdemeanor. Conviction carries imprisonment of not more than one year or a fine of not more than US$5,000. The same section makes it a violation for an awarding authority, owner or contractor to consider a bid, sign a contract or allow work to start before the bidder or contractor holds the required licences.

License groups and financial limits

The LLR sets bid and job limits by license group. After the 2023 change the net worth or working capital figures went up, and a surety bond equals the group's net worth requirement instead of twice it. An applicant must meet either the working capital or the net worth figure, not both.

General contractor groups
GroupBid and job limitWorking capital or net worth
1US$100,000US$10,000 or US$20,000
2US$400,000US$40,000 or US$60,000
3US$1,000,000US$100,000 or US$150,000
4US$3,000,000US$175,000 or US$250,000
5UnlimitedUS$250,000 or US$350,000

Where tree work appears

Section 40-11-410 lists the licence classifications and subclassifications: building, highway, public utility and specialty general contractors, plus mechanical contractors. Grading is a highway subclassification. The chapter and the LLR pages name no tree work, tree removal or pruning, and the exemptions in section 40-11-360 do not mention it. Those exemptions include residential owners doing their own work, work on federal sites and contractors working for the state Department of Transportation under its prequalification rules.

The Board regulates general and mechanical contractors, construction managers, burglar and fire alarm contractors, fire sprinkler contractors and the boiler safety program. General contractor licence renewals for 2026 to 2028 are open on its home page.

The state's storm-season rules are under storm contractor rules in South Carolina. Other states are in the contractor licences overview.