ArbNation Join free

Debris management plans: what states and counties publish

Okaloosa County and the Solid Waste Authority of Palm Beach County in Florida publish full debris plans, and Texas publishes temporary site guidance. They set tree-size cut-offs, site distances and a FEMA cost-share letter.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Two Florida plans and one Texas leaflet show what local and state debris plans contain when trees come down in a storm.

Okaloosa County, Florida

The Countywide Disaster Debris Management Plan for Okaloosa County carries the heading "Updated June 17, 2019" on its first page, and the file name on the county site gives 2023. The plan says it draws on the FEMA Debris Management Guide 325 of July 2007 and meets the planning requirements of the Public Assistance Sandy Recovery Improvement Act of 2013. It covers every type of disaster debris, vegetative debris included.

Its contents run from purpose and scope through policies, a concept of operations, responsibilities, and training and exercises. Eleven attachments follow. They include priority roadways, the characteristics of a temporary debris disposal site, a standardized load ticket, a standardized truck placard, contract technical specifications, a price sheet, debris quantity estimates and a list of potential removal and monitoring contractors.

Under the plan, protecting public health and safety has the highest priority. Temporary debris management sites let debris be collected and sorted, and let its volume be reduced by grinding or incineration. The plan names air curtain incineration when approved. It also calls for segregating vegetative debris from construction and demolition debris, white goods and hazardous waste before reduction, as far as practical.

The plan restates FEMA's rules for private property. Hazardous tree removal is eligible only for a tree more than six inches in diameter at breast height that meets any of the listed criteria. These are more than 50 percent of the crown damaged or destroyed, a split or broken trunk, branches that expose the heartwood, or a lean of more than 30 degrees with evidence of ground disturbance. Hazardous limb removal is eligible only if the limb is more than two inches in diameter at the point of break. Debris from vacant lots, forests, heavily wooded areas and unimproved property is listed as ineligible.

Solid Waste Authority of Palm Beach County, Florida

The Solid Waste Authority of Palm Beach County (SWA) publishes the 2025 plan with 2026 revisions. The plan is based on a category 4 hurricane, with wind speeds above 131 miles per hour. The 2026 revision notes record that the debris monitoring consultant and the removal and disposal contractors remain the same, and that the contracts do not expire until May 2028. It also lists updates to the debris zone estimates, the municipal debris estimates and the load ticket text.

The plan carries a FEMA Region IV letter of July 29, 2014 to the Florida Division of Emergency Management. The letter accepts the Palm Beach County plan for FEMA's Public Assistance Alternative Procedures Pilot Program for Debris Removal. The program allows a one-time 2 percent federal cost share increase for debris removal done within 90 days from the start of the incident period. FEMA found the plan contained the basic planning elements and at least one prequalified debris and wreckage removal contractor. The letter adds that acceptance does not approve any operational part of the plan or promise federal funding, and that cost eligibility follows Public Assistance authorities and policies.

The contract section sets size lines for trees. Hazardous trees twelve inches or greater in diameter, measured three feet from the base or at chest height, are removed, along with hanging limbs two inches or greater in diameter. Leaning hazardous trees under twelve inches are flush cut and placed on the right-of-way as vegetative debris, and the Authority does not pay a unit rate for them. Uprooted hazardous stumps of 24 inches or more, measured 24 inches from the base, are removed. A smaller stump counts as normal vegetative debris. The plan's guidelines for temporary sites name two ways to manage vegetative storm debris: chipping and grinding for mulch, compost or boiler fuel, or an air curtain burner.

Texas: temporary debris management sites

The Texas Commission on Environmental Quality (TCEQ) leaflet RG-518a, dated April 2025, describes a temporary debris management site (TDMS) as an authorized site for managing debris from a declared disaster for up to 90 days. A facility may be eligible for FEMA reimbursement after a declared disaster if it has TCEQ temporary authorization.

ItemTCEQ RG-518a
Who can applyLocal governments and TCEQ-authorized municipal solid waste facilities such as transfer stations and landfills
How to applyA complete TDMS application, Form 206601, and a map to the local TCEQ Regional Office. Approval from that office comes before the site is used, and a site can be designated before a disaster is declared
LocationAbove the 100-year floodplain and outside known wetlands. At least one quarter mile from public or private water supply and from known caves, springs and streams
Sites taking putrescible wasteAt least 5,000 feet from runways used only by piston-engine aircraft, or not within 10,000 feet of any runway used by turbojet aircraft unless the Federal Aviation Administration approves
Burning or chippingStricter requirements apply

TCEQ names a separate leaflet, RG-518, on managing debris from declared disasters, and RG-049 on outdoor burning in Texas.

Sources