Hazard assessment before a climb: dead wood, power lines, structures and stability
Five sources name what a pre-climb assessment covers: defects and dead wood, power lines, the site and stability. Power line distances differ: 10 m in the ICoP, 3.0 m to 8.0 m in the NSW code, four and six metres in the New Zealand code.
Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.
The named codes and training bodies are described here as published. It is not training and does not teach the work.
Credits: SafeWork NSW text is adapted from the Tree works code of practice (March 2026), copyright State of New South Wales (SafeWork NSW), licensed under Creative Commons Attribution 4.0; changes were made, because the text is summarised and reworded. WorkSafe New Zealand material is summarised from its Approved Code of Practice for Safety and Health in Arboriculture (November 2012), with the source acknowledged. HSE text is adapted under the Open Government Licence v3.0.
Who assesses, and when
The SafeWork NSW code has a competent person carry out a visual inspection and assessment of the tree when planning and before work starts. The New Zealand code asks for a proper inspection of the work area before any work or climbing, and a visual hazard assessment of the tree, including the rooted area, before climbing.
WorkSafeBC Part 26, section 26.12.0.3, has a qualified arborist or trainee arborist visually assess each tree to be climbed, or affected by the climbing, and identify how each hazard is eliminated or minimized to the lowest level practicable. A hazard found later means the plan is amended and the change passed to the affected workers.
The HSE tree climbing page rests on the Work at Height Regulations 2005. Climbing with a personal fall protection system needs a risk assessment that has shown the work can be done safely with that system.
Hazards named, by topic
| Topic | Where the sources name it |
|---|---|
| Dead wood and decay | The NSW code lists deadwood, decay, cavities, termite or borer infestation and root damage. The New Zealand code gives decay or rot and dead branches as its first examples. WorkSafeBC lists rot, root damage and stem damage as recurring failure patterns. The ICoP asks for structural defects in the tree and in adjoining trees. |
| Power lines | The NSW code puts the location of overhead electric lines and underground services in its planning list and refers to its chapter 11, Electrical safety. Table 5 there gives approach distances for ordinary persons: 3.0 m up to 132,000 volts, 6.0 m above that up to 330,000 volts and 8.0 m above 330,000 volts. The New Zealand code lists power lines among the hazards found by inspection. It sets four metres from lines up to and including 110 kV and six metres above 110 kV. The ICoP, 3.4.7, calls for a risk-based approach to aerial work within 10 m (United Kingdom specific) of power lines, with specialist advice from the line owner. |
| Structures and services | The ICoP's constraints list names utilities, meaning rail, gas, water and overhead or underground services, public access to roads and footpaths, and tree protection. Sections 3.4.8 to 3.4.10 cover underground services, highways and rail. |
| Stability | The NSW code names wind loading, ground conditions, root plate failure and recent works nearby, such as excavation, that could affect the stability of the tree. WorkSafeBC names lean, root collar and roots. The ICoP adds the health and stability of neighbouring trees. |
| Other hazards on the tree | The NSW code names embedded wire, nails or spikes, branches of adjacent trees that could lodge a cut piece, and stings, bites and plant allergies. The ICoP names bees and wasps and protected species. |
The NSW inspection factors
The NSW code's Table 1 lists the factors for the tree assessment and visual inspection. They are species, health of the tree, condition of the crown and foliage, decay at the base or in branch forks, objects embedded in the tree, proximity of other trees, animal or insect activity, and recent works nearby.
For species, it gives willows, coral trees and poplars as examples that may fail easily. For the crown, a lean in one direction points to risks such as loose or dead branches, vines that mask structural defects, insect colonies and restricted anchor locations.
The ICoP site survey
The ICoP's section 3.4 has a survey before work starts, normally at the quotation or pricing stage. The survey area covers access and egress routes, vehicle areas, places where material is processed, dropped or lowered, and the reach of machinery. The tree condition assessment allows for species, parts hidden by ivy or epicormic growth, terrain, biotic hazards, surrounding hazards and structural defects.
At the start of work, operators confirm the tree condition on site. Assessment continues while the tree is accessed, so that hazards in the crown or stem that were not visible from the ground can be found.
Sources
- SafeWork NSW, Tree works code of practice, commenced March 27, 2026, sections 3 and 3.1, read October 19, 2026
- WorkSafe New Zealand, Approved Code of Practice for Safety and Health in Arboriculture, November 2012, sections 2.2 and 3.2.2, read October 19, 2026
- HSE, Tree climbing, read October 19, 2026
- WorkSafeBC, OHS Regulation Part 26 Forestry operations and similar activities, section 26.12.0.3, read October 19, 2026
- Arboricultural Association, Industry Code of Practice for Arboriculture: Tree Work at Height (ICoP), second edition, May 2020, section 3.4, read October 19, 2026