ArbNation Join free

Minimum approach distances in Australia: Queensland, Western Australia, New South Wales

Queensland's Electrical Safety Regulation 2026 prints exclusion zones by voltage, from 700 mm for an authorised person to 6,000 mm for an untrained one. Western Australia's danger zone is 3.0 m up to 33,000 volts and 6.0 m above.

Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Victoria is on the main approach distances page.

Queensland

The Electrical Safety Regulation 2026 says a person, operating plant or a vehicle comes within an exclusion zone for an overhead electric line when it comes within the distance in Schedule 2. Within that zone it is at an unsafe distance. A person includes clothing and any conductive object being handled.

Schedule 2 sorts people into authorised persons, instructed persons (working under an authorised person) and untrained persons. An authorised person has enough technical knowledge and experience, and either has been approved by the person in control of the line or is authorised to act for that person. Distances are printed in millimetres. The table gives those for a person at an uninsulated overhead line.

Phase to phase voltageUntrained person (mm)Authorised or instructed person (mm)
Low voltage1,000 with consultation with the person in control of the line; 3,000 withoutNo exclusion zone prescribed
Above low voltage, up to 33 kV2,000 with consultation; 3,000 without700
Above 33 kV up to 132 kV3,000750 above 33 kV to 50 kV; 1,000 above 50 kV to 110 kV; 1,200 above 110 kV to 132 kV
Above 132 kV up to 220 kV4,5001,800
Above 220 kV up to 275 kV5,0002,300
Above 275 kV up to 330 kV6,0003,000
Above 330 kV up to 500 kV6,0003,300 up to 400 kV; 3,900 above 400 kV

Operating plant and vehicles have their own columns. Plant run by an untrained person has a 3,000 mm zone up to 132 kV, 6,000 mm above 132 kV up to 330 kV, and 8,000 mm above 330 kV up to 500 kV. An authorised person running plant without a safety observer or another safe system is taken to be untrained. Insulated lines have a separate Part 3 with its own tables.

On trimming, section 265 puts a duty on an electricity entity. Trees and other vegetation are to be trimmed, and other measures taken, to prevent contact with its overhead lines that is likely to cause injury from electric shock or damage to property. Section 23 puts the same duty on the person in control of a private overhead line, with a maximum penalty of 40 penalty units.

Western Australia

The EnergySafety guidelines define the danger zone for work purposes as the area above any power line, and within 3.0 metres of a line up to and including 33,000 volts, or within 6.0 metres of a line above 33,000 volts. A person, tool, equipment or vehicle likely to come within it must follow the EnergySafety Code of Practice for Personnel Electrical Safety for Vegetation Control Work Near Live Power Lines. Training and work experience requirements in the code are graduated by voltage.

The guidelines separately give vegetation clearances. For distribution lines in urban areas the basic rule is vegetation at least two metres clear to the side and below the conductors. Table A prints clearance spaces for low voltage and for high voltage conductors under 66,000 volts. Bare high voltage conductors with spans up to 70 m have 2.0 m horizontal and 2.0 m vertical. Bare conductors with spans from 100 m up to 200 m have 4.0 m horizontal and 2.5 m vertical.

The Western Australia Building and Energy page calls the code mandatory and says vegetation work should be done by authorised vegetation management workers, formally trained for low and high voltage powerlines and watched by trained safety observers. All personnel must pass an online assessment, with a pass mark of 80%.

New South Wales

ISSC3 is a guide for network operators, in force as an interim guide from November 2016. It does not print approach distances for workers. Work within the approach distances defined in the WorkCover Code of Practice "Work Near Overhead Power Lines 2006" shall be done by accredited persons following the network operator's Electrical Safety Rules. Schedule 1 prints minimum vegetation clearances by voltage, conductor type and span length, and adds 0.5 m to bare conductor clearances in bushfire prone areas.

Sources