NERC FAC-003-5 minimum vegetation clearance distances by voltage and altitude
NERC's FAC-003-5 prints minimum vegetation clearance distances in feet and metres by voltage and altitude, such as 7.0 feet for 500 kV near sea level. It covers lines of 200 kV and above and some lower-voltage lines.
Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. FAC-003-5, Transmission Vegetation Management, is a standard of the North American Electric Reliability Corporation (NERC).
Covered lines
FAC-003-5 applies to Transmission Owners and to Generator Owners that own the lines described below. Transmission lines are covered when they meet any one of these tests.
- Overhead lines operated at 200 kV or higher.
- Overhead lines below 200 kV that the Planning Coordinator or Transmission Planner identifies as a Facility whose loss or degradation is expected to cause instability, cascading or uncontrolled separation in a planning event.
- Overhead lines below 200 kV identified by WECC as an element of a Major WECC Transfer Path in the Bulk Electric System.
The standard counts only the part of a line outside the fenced area of the switchyard, station or substation, plus any span crossing the fence. A generation line is covered if it meets one of the same three voltage tests. It must also run more than one mile (1.609 km) beyond the generating station switchyard fence to the interconnection point, or have no clear line of sight to it.
The alternating current table
The standard's Table 2 gives the minimum vegetation clearance distance (MVCD) in feet and in metres for each nominal voltage, in altitude bands up to 15,000 feet. The values are those for a 1.0 gap factor from an EPRI report filed with FERC on August 12, 2015.
| Nominal kV (maximum kV) | Sea level to 500 ft | Over 5,000 up to 6,000 ft |
|---|---|---|
| 765 (800) | 11.6 ft | 12.6 ft |
| 500 (550) | 7.0 ft | 7.8 ft |
| 345 (362) | 4.3 ft | 4.8 ft |
| 287 (302) | 5.2 ft | 5.8 ft |
| 230 (242) | 4.0 ft | 4.5 ft |
| 161 (169) | 2.7 ft | 3.0 ft |
| 138 (145) | 2.3 ft | 2.6 ft |
| 115 (121) | 1.9 ft | 2.1 ft |
| 88 (100) | 1.5 ft | 1.8 ft |
| 69 (72) | 1.1 ft | 1.2 ft |
The metric table gives, for example, 2.1 m for 500 kV and 0.7 m for 138 kV from sea level to 153 m. A footnote explains that changes in transient overvoltage factors drive the lower MVCD at 345 kV and above. Another footnote says the distances are the minimums required to prevent flash-over, and that "substantially greater distances" will be achieved at the time of vegetation maintenance. For a nominal voltage not listed, the standard says the entity should use the maximum system voltage to pick the clearance.
The Transmission Vegetation Management procedure TD-7103S of Pacific Gas and Electric (PG&E), Revision 4, effective January 27, 2025, reproduces the table for 60 or 70 kV, 115 kV, 230 kV and 500 kV. It prints 1.1 ft, 1.9 ft, 4.0 ft and 7.0 ft from sea level to 500 feet, and 1.2 ft, 2.1 ft, 4.5 ft and 7.8 ft from 5,001 to 6,000 feet.
The direct current table
The direct current table is indexed by nominal pole-to-ground voltage and prints feet with metres in brackets.
| Pole to ground | Sea level to 500 ft | Over 5,000 up to 6,000 ft |
|---|---|---|
| ±750 kV | 14.12 ft (4.30 m) | 16.2 ft (4.94 m) |
| ±600 kV | 10.23 ft (3.12 m) | 11.98 ft (3.65 m) |
| ±500 kV | 8.03 ft (2.45 m) | 9.55 ft (2.91 m) |
| ±400 kV | 6.07 ft (1.85 m) | 7.33 ft (2.23 m) |
| ±250 kV | 3.50 ft (1.07 m) | 4.34 ft (1.32 m) |
Inspection and work plan terms
Requirement R6 calls for a Vegetation Inspection of 100% of an entity's applicable lines at least once per calendar year, with no more than 18 calendar months between inspections on the same right of way. Requirement R7 calls for completing 100% of the annual vegetation work plan so that no encroachment occurs within the MVCD. NERC's rationale for R6 says the minimum frequency rests on average growth rates across North America and common utility practice.
Version history
NERC's board adopted version 4 on February 11, 2016, adjusting the alternating current MVCD values to match a report filed on August 12, 2015 in Docket No. RM12-4-002, FERC's Order No. 777 and empirical flashover tests. FERC's Order No. 777, issued March 21, 2013, approved FAC-003-2. It extended the standard to some lines below 200 kV. Those are lines that are an element of an Interconnection Reliability Operating Limit or a Major WECC Transfer Path. It also added a minimum annual inspection and put the MVCD values into the text of the standard.
NERC's board adopted version 5 on May 13, 2021, and a FERC delegated letter order of March 4, 2022, Docket No. RD22-2-000, approved it. A FERC information collection notice of 2022 says FAC-003-5 replaced the Interconnection Reliability Operating Limit language.
Sources
- North American Electric Reliability Corporation, Reliability Standard FAC-003-5 Transmission Vegetation Management, read October 15, 2026
- Federal Energy Regulatory Commission, Order No. 777, Revisions to Reliability Standard for Transmission Vegetation Management, Docket No. RM12-4-000, March 21, 2013, read October 15, 2026
- Pacific Gas and Electric Company, Utility Procedure TD-7103S Vegetation Management Transmission Program, Rev 4, effective January 27, 2025, read October 15, 2026
- Federal Energy Regulatory Commission, notice on information collection FERC-725M, Docket No. IC23-3-000, Federal Register, November 1, 2022, read October 15, 2026