Radios, hand signals and calls between climber and ground: what the codes require
HSE, SafeWork NSW, WorkSafe New Zealand and the Arboricultural Association want communication set up before cutting or work starts. OSHA's logging rule says chain saw noise is not a signal.
Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.
Signalling between climber and ground is described here as the named codes and training bodies publish it. It is not training and does not teach the work. Crane signal tables are outside it.
At a glance
| Source | Methods named, and when |
|---|---|
| OSHA | Hand signals, whistles, horns, radios, when noise, distance or restricted visibility block normal voice |
| HSE | A radio or a third person relaying, when the chainsaw operator cannot see the machine operator |
| SafeWork NSW | Two-way closed loop devices, hand signals, whistles, phones, agreed before workers start |
| WorkSafe NZ | Commands, prearranged hand signals, vocal commands, before cutting, back cuts and winching |
| AA ICoP | Verbal, hand signals, radio, telephone, agreed before any work starts |
OSHA: signals in the logging standard
The U.S. rule sits in the logging standard, 29 CFR 1910.266, which OSHA publishes with a paragraph on signalling and signal equipment. Hand signals or audible contact, such as whistles, horns or radios, are to be used whenever noise, distance, restricted visibility or other factors prevent clear understanding of normal voice communications between employees.
The same paragraph says engine noise, such as from a chain saw, is not an acceptable means of signalling. Other locally and regionally recognised signals may be used. Only a designated person gives signals, except in an emergency.
A neighbouring paragraph asks each employee at a logging work site to work within visual or audible contact with another employee. The employer accounts for each employee at the end of each shift. For how the standard reaches tree care, see OSHA standards for tree work.
HSE: agreed signals for winch work
The HSE page on winches in directional felling covers tractor winches and hand winches used as an aid to directional felling and assisted takedown. It lists a clear communication system as the first item before work starts.
- The chainsaw operator is in control and gives the instructions to the machine operator.
- An emergency stop signal is obeyed at once by everyone.
- Any unclear signal is regarded as a stop signal.
- If the chainsaw operator cannot see the machine operator, a radio or a third person relaying the message must be used.
HSE adds that all operators must receive training in running the machine, the tasks, the use of personal protective equipment and keeping the machine in working order. The page carries the Open Government Licence v3.0.
SafeWork NSW: methods and noise
The SafeWork NSW Tree works code of practice, which commenced on March 27, 2026, puts communication methods in section 3.4. The method is part of the risk assessment and is agreed before workers start. The task, the equipment, noise and the workers' positions set the choice.
The listed methods are two-way closed loop devices, especially for a worker up a tree or on a temporary work platform, hand signals, whistles and mobile telephones. Mobile phones should not be used as the primary method without prior confirmation of network coverage and service at the location.
The code wants climbers able to communicate with others in the tree and with ground workers, and ground workers able to alert people working at height to any problem. It names chipper operation and distance between workers as noise sources a system has to allow for.
Elsewhere the code ties communication to hearing. Noise makes it harder to hear verbal instructions and warning signals. It sets the exposure limits at 85 dB(A) over eight hours and a peak of 140 dB(C), and says hearing protection must be provided where noise cannot be eliminated. For isolated work, section 13.3 asks for agreed methods and equipment such as radios or phones, with routine check-ins.
WorkSafe New Zealand: commands and signals by task
The Approved Code of Practice, Safety and Health in Arboriculture, dated November 2012, words the duty task by task. Effective communication with at least one other person shall be kept up with the climber during arboricultural work.
- Pruning: effective communication is established between the arborist in the tree and the ground crew before cutting or dropping branches.
- Dismantling: the same link is kept up before cutting and lowering branches.
- Back cut: a command such as "stand clear" from the chain saw operator, and a response such as "all clear" from the workers supporting the removal. Prearranged hand signals may also be used, and only designated persons give them.
- Machine-assisted takedown: the faller and the machine operator have an effective means of communication, which may need an intermediary.
- Winching: the feller tells winch operators the line tension and the winching and pulling speeds, and visual signals and vocal commands are set before felling starts.
On hearing, the code says all workers wear hearing protection in any area with harmful noise, and chainsaw operators wear at least grade 4. A lone worker has access to suitable communication at all times. Helicopter work needs a back-up method if radio fails.
Arboricultural Association: the ICoP
The Industry Code of Practice for Arboriculture: Tree Work at Height, second edition, May 2020, has a communication section ahead of its supervision section. Effective communication is determined and agreed before any work starts and stays effective throughout.
It lists what can weaken a system: noise, weather, visual interference and dense canopy. Whether the crew understands the method counts too, for example hand signals, language barriers or a learning impairment. For the drop zone, the code asks that pre-determined communication links exist between those working at height and ground staff.
The code summarises the Control of Noise at Work Regulations: employers assess the noise risk, reduce exposure and provide hearing protection if other methods fall short.
Where the five sources differ
Only OSHA names the chain saw as an unusable signal. Only HSE and WorkSafe NZ write the stop-signal and back-cut calls into the felling steps. SafeWork NSW alone says a mobile phone should not be the primary method without confirmed coverage. For aerial rescue links to the same ground crew, see aerial rescue.
Sources
- U.S. Department of Labor, OSHA, 29 CFR 1910.266 Logging operations, paragraphs (d)(6) and (d)(7), read October 15, 2026
- Health and Safety Executive, Winches in directional felling, page dated August 26, 2026, read October 15, 2026
- SafeWork NSW, Tree works code of practice, March 2026, read October 15, 2026
- WorkSafe New Zealand, Approved Code of Practice, Safety and Health in Arboriculture, November 2012, read October 15, 2026
- Arboricultural Association, Industry Code of Practice for Arboriculture: Tree Work at Height, second edition, May 2020, read October 15, 2026