Risk assessment and method statement records: the fields HSE and the AA list

HSE's risk assessment template keeps a record of five things, and its five steps end with recording and review. The tree work code adds a method statement with twelve listed principal contents.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. It sets out the record fields in two HSE pages on managing risk and in the Industry Code of Practice for Arboriculture: Tree Work at Height, Edition 2, published by the Arboricultural Association in May 2020.

HSE's five steps

HSE describes risk management as a step-by-step process for controlling health and safety risks from workplace hazards. The employer can do it or appoint a competent person to help. The steps are:

  1. Identify hazards: look at how people work, the chemicals used, safe and unsafe practices and the state of the premises, and look back at accident and ill-health records.
  2. Assess the risks: for each hazard, decide how likely harm is and how serious it could be.
  3. Control the risks: look at the controls already in place, then at further controls such as replacing materials, machinery or process, reorganising the work or providing protective equipment.
  4. Record the findings.
  5. Review the controls, and review them again after changes, problems, accidents or near misses.

HSE says an employer with 5 or more employees must record significant findings: the hazards, who might be harmed and how, and what is being done to control the risks. It states that controls only have to be reasonably practicable, which it describes as balancing the level of risk against the money, time or trouble needed to control it.

Fields in the HSE risk assessment template

Items the HSE template keeps a record of, in the order HSE lists them
FieldWhat HSE lists
1Who might be harmed and how
2What is already being done to control the risks
3What further action is needed to control the risks
4Who needs to carry out the action
5When the action is needed by

HSE offers the template in Word and Open Document formats. It adds that an example cannot be copied with a company name on top, because that would neither satisfy the law nor protect employees.

Risk control in the tree work code

The Arboricultural Association code says a safe system of work must be in place before tree work at height starts, informed by a suitable and sufficient risk assessment. It splits the paperwork by role.

  • The responsible person creates a common-factor or generic assessment of the risks that stay largely unchanged from site to site.
  • The competent person appraises the work, usually at the quoting stage, and drafts a job or site-specific assessment that includes emergency procedures.
  • The proficient operator appraises the site on the day and validates the site-specific assessment, applying its control measures.

The code calls a risk control system suitable and sufficient when the significant findings are recorded, it is clear and consistent, risks are managed proportionately, the measures are effective and it is communicated to everyone affected. Site-specific assessments also have to carry emergency planning and response information, and there must be a way to update them as the work goes on.

Contents of a method statement

The code defines a method statement as a written document detailing how a task will proceed to give a safe system of work. It may be used to record the system of work and is normally prepared by the competent person. The format may vary with the recipient, but the code lists these principal contents.

Method statement contents listed in section 3.3.6.1
ItemContent
aScope, location and timing of the works, with reference to job specifications
bAccess and egress arrangements
cSequence of operations
dControl measures for anyone affected by the task
eReference to good practice guidance where it applies
fSpecification, type and number of machines, people and equipment
gApplicable certification and documents for personnel and machinery
hProvision for emergencies, including first aid
iWelfare
jCommunication methods between operators and the client
kSafety hold points for exchanging safety-critical information, such as site induction or permits to work
lMeasures for environmental impacts on the work site

Everyone engaged in or affected by the work, such as owners, clients and other contractors, is to be made aware of the risks. All parties are briefed before work starts, with evidence of each individual's acknowledgment.