Safety factors and working load limits for rigging gear: what OSHA, ASME B30.9, the NZ code and LOLER say
OSHA requires rated capacities on slings and sets proof-test multiples, LOLER requires safe working loads to be marked, and the New Zealand code states factors for climbing rope, winch line and strops. The ASME pages give scope only.
Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. The wording below is what the named codes and regulators publish. It is not training and does not teach the work.
The basis each source names
| Source | Working load basis |
|---|---|
| OSHA 29 CFR 1910.184, slings | Rated capacity, also called working load limit, is the maximum working load permitted by the section. Slings are not loaded beyond their rated capacities. Alloy steel chain slings carry identification of size, grade, rated capacity and reach. Wire-rope slings are marked with the recommended safe working load for the hitches used, the angle it is based on and the number of legs. Fiber-rope slings are marked with the rated capacity for the hitches used and the angle. Synthetic web slings show rated capacities for each hitch and web material. |
| OSHA 1910.184, test multiples | New and repaired metal mesh slings are proof tested at a minimum of 1½ times their rated capacity. Welded end attachments on wire-rope slings are proof tested at twice their rated capacity before first use. Attachments on alloy steel chain slings have a rated capacity at least equal to the chain, or the sling is used no higher than its weakest component. |
| OSHA 1910.184, angle of loading | Angle of loading is the inclination of a leg or branch of a sling measured from the horizontal or vertical plane, as shown in Fig. N-184-5. An angle of five degrees or less from the vertical may be considered a vertical angle of loading. The figure notes add that for legs more than 5 degrees off vertical, the actual angle must be considered. The section prints no load-by-angle factor table. |
| ASME B30.9, Slings (2025) | Covers fabrication, attachment, use, inspection, testing and maintenance of alloy steel chain, wire rope, metal mesh, synthetic fiber rope, synthetic webbing and polyester fiber yarn slings. The scope page prints no factor. |
| ASME B30.26, Rigging Hardware (2026) | Covers detachable hardware: shackles, links, rings, swivels, turnbuckles, eyebolts, hoist rings, wire rope clips, wedge sockets, rigging blocks and load indication devices. The scope page prints no factor. |
| HSE, Great Britain, LOLER overview | All lifting equipment, accessories included, is marked with its safe working load, the maximum load it can safely lift. Where the load depends on configuration, the marking reflects each configuration. Equipment must be of adequate strength and stability and is thoroughly examined before first use, unless a valid Declaration of Conformity is less than 12 months old. |
| WorkSafe New Zealand, arboriculture code (2012) | The safe working load of climbing rope and equipment is 10 percent of the breaking or tensile strength of the rope. In the winch section, line pull does not exceed the safe working load of the rope or its accessories, and for all arboricultural operations the safe working load is one-sixth of breaking strength. Strops that anchor winches or pulling blocks are at least 1.5 times the safe working load of the pulling rope. Strops or taglines in helicopter work have an ultimate breaking strength three times their safe working load. |
| SafeWork NSW, Tree works code of practice (2026) | Before winching, lifting or lowering a load, the working load limit should be determined and observed. The safe working load of lowering equipment provides a safety factor and should not be exceeded under any circumstances. Lowering connection hardware should be labelled with age and working load limit. |
| Arboricultural Association, Safety Guide 3, Rigging and Dismantling (2021) | A planning checklist asks what the safe working load of the equipment is, whether it is adequate for the load, and what safety factor is used and whether it allows for age, wear and tear. |
The OSHA sling section
Section 1910.184 applies to slings used with other material handling equipment to move material by hoisting. It names alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope of conventional three-strand construction, and synthetic web of nylon, polyester and polypropylene.
A sling that is damaged or defective is not used, and slings are not shortened with knots, bolts or makeshift devices. A competent person designated by the employer inspects the sling and all fastenings each day before use. Alloy steel chain slings also get a periodic thorough inspection, with a record of the month it was last done.
The section sets minimum clear lengths too. Wire rope between splices or end fittings must be 10 times the rope diameter for cable laid and 6 x 19 and 6 x 37 slings, and 40 times for braided slings. Fiber-rope slings need 10 times the rope diameter between eye splices. These are length limits, not safety factors.
The New Zealand figures
The New Zealand glossary ties safe working load to the figure the manufacturer specifies. The code's own percentages apply to specific uses. Knots can weaken a rope by up to 50 percent of its breaking strength, the code adds, and friction hitches should be tied with a minimum cordage diameter of 70 percent of the climbing line.
On roping down and slinging, the code says the weight of sections to be removed should be carefully assessed so the selected lowering point and ropes do not exceed safe working loads. No wire rope shall be used unless the manufacturer or vendor has certified its breaking strength.
Differences in what a number means
OSHA defines rated capacity as the working load limit. HSE and the New Zealand code use safe working load. The New South Wales code uses both working load limit and safe working load. The New Zealand code states a ratio of safe working load to breaking strength. OSHA states the ratio only as a proof-test multiple. LOLER states none and puts the duty on marking and examination.
Sources
- OSHA, 29 CFR 1910.184 Slings, read October 15, 2026
- ASME, B30.9 Slings, 2025 edition listing, read October 15, 2026
- ASME, B30.26 Rigging Hardware, 2026 edition listing, read October 15, 2026
- HSE, Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) overview, read October 15, 2026
- WorkSafe New Zealand, Approved Code of Practice for Safety and Health in Arboriculture, November 2012, read October 15, 2026
- SafeWork NSW, Tree works code of practice, commenced March 27, 2026, read October 15, 2026
- Arboricultural Association, Safety Guide 3: Rigging and Dismantling, December 2021, read October 15, 2026