ArbNation Join free

Timber harvest notification and permit rules by US state: Maine, Oregon and Washington

Maine requires notice before harvest and exempts a landowner's harvests of 2 acres or less in a 12-month period. Oregon sets 15 days' notice. Washington sorts forest practices into four classes, with Class II starting five calendar days or less after notice.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Three states have statute or rule text that opened: Maine, Oregon and Washington. Massachusetts and New Hampshire have no figures here, and the other states were not sourced.

At a glance

StateRuleTiming and trigger
Maine12 M.R.S. section 8883-BNotice to the Bureau before timber harvesting; valid 2 years or until the harvest ends
OregonOAR 629-605-0150, under ORS 527.670Notice to the State Forester at least 15 days before an operation starts
WashingtonRCW 76.09.050Class II: five calendar days, or a lesser time the department sets, after notice. Class III and IV: application approved within 30 calendar days
MassachusettsForest Cutting Practices ActNot sourced
New HampshireTimber tax, Intent to CutNot sourced
All other statesNot checkedNot sourced

Maine: notification under 12 M.R.S. section 8883-B

Unless an exemption or a rule says otherwise, a landowner or designated agent must notify the bureau before beginning timber harvesting. Inside a municipality, the bureau sends a copy of the form to the municipal clerk. The notification goes on the bureau's form, unless a rule allows another method, and the statute lists what it carries:

  • the names, addresses and phone numbers of the landowner, any designated agent and, if known, the harvesters;
  • the name and address of any licensed professional forester consulted;
  • the municipality or township and county, and the nearest all-weather road;
  • the approximate start and finish dates and the anticipated acreage;
  • whether the land is taxed under the Maine Tree Growth Tax Law, and whether it is being harvested to convert to another use within 2 years;
  • signatures, the date of notification, and a map based on a USGS 7.5 or 15 minute topographic map or one of equal or better detail.

The landowner keeps a copy of the form for inspection and posts the notification number at the harvest site where it is easy to see. A notification stays valid for 2 years from the date of issue or until the harvest is complete, whichever comes first. A harvest that runs past 2 years needs a new notice.

Three activities are exempt. One is harvesting for the owner's own use, when the products are not sold or offered for sale or used in the owner's primary wood-using plants. Another is precommercial silvicultural forestry. The third is harvesting by the landowner within a 12-month period when the total area on that landowner's land is 2 acres or less. The bureau may develop alternative forms for operations of 10 acres or less, and for harvests to convert land to another use when a person certified in erosion control by the Department of Environmental Protection manages erosion and sedimentation.

Failure to notify is a civil violation, with a fine not exceeding US$1,000 for each occurrence and a court order to stop the operation possible. Each day of failure is a separate offense. Continued operation after a cease order carries a fine not exceeding US$1,000 for each day. Inaccurate information on the form is a civil violation with a fine of not more than US$1,000 for each occurrence. Addresses and phone numbers of owners of fewer than 1,000 acres statewide are confidential.

Oregon: notification to the State Forester

OAR 629-605-0150 says the operator, landowner or timber owner notifies the State Forester, as ORS 527.670(6) requires, at least 15 days before starting an operation. The State Forester can waive the 15 days in writing, case by case, when the site has been previewed or the operation has only minor potential for resource damage. The waiver does not apply to aerial chemical applications or to operations that need a written plan under ORS 527.670(3)(a), (b) and (c).

An operation that started after proper notification can continue into the next calendar year without a new notice, on three conditions. Nothing in the notification has changed, the operator gives written notice of intent to continue within the first two months of that year, and the operation actively continues within the first six months. No notification is valid after the second calendar year unless the landowner or operator asks in writing to extend it before the end of that year, nothing has changed, and the State Forester approves.

The notification goes on forms the State Forester provides, with a map to scale or a corrected aerial photograph showing the boundary of the unit. A notice for operations in more than one county cannot be combined, because of tax collection requirements. Where chemicals are applied, the notification names the chemicals, the application method and the fertilizer rate per acre. The rule also states that it does not relieve anyone of ORS 477.625, which requires a permit to use fire or power-driven machinery, or of ORS 321.550, which requires notice of intent to harvest to the Department of Revenue.

Washington: four classes under RCW 76.09.050

The Forest Practices Board sets by rule which practices fall in each class. The statute describes them this way.

ClassStatute wordingTiming
IMinimal or specific practices with no direct potential for damaging a public resourceNo application or notification
IILess than ordinary potential for damageNo application; work may begin five calendar days, or a lesser time the department determines, after the department receives written notification, once fees are paid
IIIForest practices other than those in Classes I, II and IVApplication approved or disapproved within 30 calendar days of receipt
IVConversion to another use, land not to be reforested, or potential for a substantial impact on the environmentDecision within 30 calendar days; extendable 30 more if a detailed statement is needed

Class II excludes practices on land being converted to another use, within shorelines of the state, and timber harvesting or road construction in urban growth areas, which are Class IV. Work does not start on a Class II, III or IV practice until the forest practice fees under RCW 76.09.065 are received. If the department misses its time limit on an application, the statute treats it as approved, with exceptions, and where seasonal field conditions prevent evaluation the department can issue an approval conditional on review within sixty days. Within two business days of receiving a notification or application, the department sends a copy to the departments of ecology and fish and wildlife and to the county, city or town.

What is not sourced

No figure from Massachusetts or New Hampshire is printed. Owners of woodlots will find the sale side in woodlot timber sales and grants in woodland programs in the United States.

Sources