ArbNation Join free

Tree rules in Miami: Chapter 17 permits, specimen trees and the pruning threshold

Miami's Chapter 17 tree protection ordinance requires a permit before removing or relocating a tree, or trimming more than 25 percent of it. The City's FAQ prints a US$12.00 fee per tree.

Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Miami's tree rules sit in Chapter 17 of the City Code. The City's Building Department tree pages describe the permit, and an older City FAQ from the Environmental Resources Division gives sizes, fees and replacement answers. That FAQ is dated November 2015 in its file name, so its figures may differ from the code as later amended.

What triggers a permit

The Building Department page says Chapter 17 regulates removal, relocation, pruning and trimming of trees to protect and restore the tree canopy. A tree removal permit is required before a tree is removed or relocated, unless an exemption applies. A pruning permit is needed when pruning exceeds 25 percent of the canopy, crown or living foliage within one year.

The FAQ words the trigger the same way. A permit is required before removing, relocating, root pruning or trimming more than 25 percent of any tree. It is also required before removing, relocating, root pruning or trimming any tree, plant or shrub in the City's right-of-way.

The Trees page of the Permits section lists a tree permit for new construction and a standalone tree permit. It describes the City as monitoring all tree removal to keep the canopy healthy.

Size definitions in the FAQ

TermDefinition printed in the FAQ
TreeMinimum height 12 feet and diameter at breast height of 2 inches
PalmMinimum height 16 feet and diameter at breast height of 6 inches
Specimen treeAn individual trunk, or the sum of the trunks of a multiple-trunk tree, with a diameter at breast height of 18 inches or more

Shrubs, hedges, vines and ground covers on private property are excluded from tree permitting. A permit is not required to plant on private property.

Fees, applicants and the process

The FAQ says the property owner or the owner's authorized representative applies, in person at the Building Department, on the Building Permit Application. The fee is US$12.00 for each affected tree, whether the work is trimming, removal or relocation. The FAQ adds that fees are subject to change.

A permit expires after 180 days if no required inspections have been approved. A final inspection follows the work. The FAQ also says any aggrieved party with standing under state law may appeal a department decision on a tree permit. The written notice of appeal goes to the Planning and Zoning Department within 10 calendar days of the intended decision.

Replacement, mitigation and special cases

  • Prohibited or invasive species trees need a removal permit, but no fee is assessed and no replacement is required.
  • A certified arborist report may be required to confirm the condition of a tree. Dead or hazardous trees may not require replacement, on the department's determination.
  • Relocated trees need no replacement, because they are preserved. They are inspected for condition at completion.
  • Hat-racking or topping is described as inter-nodal cuts made without regard to tree health or structure. The FAQ calls it prohibited and a violation of Chapter 17.
  • On a neighbour's overhanging branches, the FAQ says state law gives a right to trim past the property line, and that the Chapter 17 tree requirements still apply.

The Building Department page links to pages on submitting and releasing a tree protection bond and on planting a tree in the right of way. Neither page prints a bond amount.

Who handles what

The FAQ names the Environmental Resources Division for tree permit questions and the Public Works Department as the other contact for trees in the right-of-way. It lists the Department of Code Compliance for reports of a possible violation. Permit status can be had from the Environmental Resources Division or through the City's iBuildMiami online access.

Sources