Clearing trees for solar sites: what agencies say about siting and tree removal

Maine's forestry agency ties tree clearing for solar to a notification and a two-year change-of-use deadline. Virginia's data put half of its solar acreage on former forest, and USDA puts the national rural share at 11 percent.

Checked against the sources at the bottom of this page on October 21, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. Maine's Department of Agriculture, Conservation and Forestry (DACF) issued technical guidance, updated January 8, 2021. Virginia Commonwealth University and the Virginia Department of Energy published a land-use study in December 2024. The USDA Economic Research Service published report ERR-330 in May 2024.

Where Maine's forestry agency prefers solar sites

The DACF guidance states that it is not legal advice. As a statement of policy, DACF strongly recommends siting commercial-scale solar on non-agricultural land, and away from places that hold rare plant populations or rare natural communities. It also names land that would fragment large blocks of undeveloped forest or cut the land's ability to sequester carbon.

The non-agricultural sites DACF lists are the tops of buildings, parking lots, closed landfills, heavily disturbed sites such as brownfields, and regenerating wooded areas that are not mainly important farmland soils.

Clearing forest in Maine

DACF describes solar on forested land as a change of land use. Under Maine Forest Service rules in Chapter 26, clearing land that produces forest products for a non-forest use such as a solar project requires the landowner to file a Forest Operations Notification. The notification must identify the intended change of use.

The change of use must be completed by the end of the second full calendar year after the year of the timber harvest. If it is not, the harvest must have met the Forest Regeneration and Clearcutting Standards in Chapter 20. DACF puts it as the solar facility needing to be developed within two years of clearing the trees, and adds that a scoping or option agreement does not guarantee the land will be developed.

Other Maine Forest Service rules can apply to the harvest. Chapter 21 covers shoreland areas, and Chapter 27 covers unorganized and deorganized areas. DACF also notes that timber harvesting must meet all other federal, state and municipal requirements. For a harvest in a Development Subdistrict inside a Land Use Planning Commission area, DACF points to the regional Commission office for permitting requirements.

Maine permit thresholds named in the guidance

  • More than one acre of disturbance in an organized area falls under the Stormwater Management Law.
  • More than 20 acres, counting everything inside the fence plus maintenance areas, roads, collector lines and shade management areas, falls under the Site Location of Development Act.
  • Work in, on, over or next to protected natural resources such as rivers, streams and wetlands falls under the Natural Resources Protection Act.
  • In Land Use Planning Commission areas, grid-scale solar means one or more acres, more than 250 kilowatts, and power sold offsite. These facilities will likely need rezoning and a development permit.

DACF also flags tax effects. Land in the Tree Growth program can lose that status if its use changes, with withdrawal penalties, and the guidance sends owners to their municipal assessor first.

Construction recommendations that touch trees and stumps

DACF recommends limiting soil disturbance, including cutting and clearing of trees and stumping, to the extent practicable. For timber harvest it recommends frozen and snow-covered ground, the driest summer months, or slash to support equipment. It strongly discourages harvest in spring and fall when streams are high and soils saturated.

Where possible, DACF recommends avoiding stumping, grubbing and removal of sod, since stumps and sod left in place give soil stability and bearing strength. For overhead lines and poles, it recommends that pole placement and wire height not block access for harvest equipment.

Virginia: what the cleared land was

The Virginia study uses aerial imagery to measure disturbed acreage at 94 utility-scale facilities of 5 megawatts or more, as of June 2024. Disturbed land averages 6.93 acres per megawatt. Of 30,632 disturbed acres, 15,393 were forest, which is 50 percent, against 54 percent forest across the state. Cropland was 28 percent and pasture 11 percent.

The forest acres converted equal 0.1 percent of Virginia's 14.77 million acres of forest. Of the more than 18,000 acres converted between 2021 and 2024, 45 percent was forest. The authors give the share in the 2016 to 2021 data as 58 percent in the text and 57 percent in their comparison table.

The study also rates forest quality with the Virginia Department of Forestry's Forest Conservation Value model. Of 13,852 solar-disturbed forest acres in the model, 54 percent fall in the two lowest tiers, Average to Moderate. Another 24 percent are High, and 21 percent are Very High to Outstanding. Across all Virginia forest in the model, 39 percent is rated Very High or Outstanding.

A few projects drive the high-value figures. Only 12 facilities touched more than 50 acres of Very High or Outstanding forest, and two of them account for 51 percent of the 2,937 acres rated that high.

The study also records a 2022 Virginia law, HB 206, that changes the permit-by-rule for solar facilities over ten acres and between 5 and 150 megawatts. Projects disturbing more than 10 acres of prime agricultural soils or more than 50 acres of contiguous forest become subject to added avoidance and mitigation measures once the regulations are finalized by December 31, 2024.

United States rural sites

USDA's Economic Research Service looked at solar and wind sites in rural areas from 2009 to 2020. It finds 70 percent of rural solar farms on agricultural land. Before installation, 11 percent of solar land was classed as forest and 6 percent as developed. By region, the Atlantic had the highest forest share at 23 percent, and the South had 17 percent.

After installation, solar sites changed land cover more often than wind sites. Where forest sites changed category, they mostly moved into the report's Other class.

Two measures of forest share

Virginia's 50 percent and the national 11 percent come from different data. The Virginia figure is one state's disturbed acreage overlaid on the Virginia Land Cover Dataset. The USDA figure is the dominant land cover category within a buffer around rural solar sites across the contiguous United States.

Sources