Excavators and track loaders used for lifting: HSE, OSHA and WorkSafe NZ

HSE says LOLER applies when a tree-work excavator lifts, and some jobs need a current thorough-examination certificate. OSHA's crane rule leaves excavators and track loaders out, and New Zealand set conditions for mobile plant that lifts.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. The Health and Safety Executive in Great Britain, the US Occupational Safety and Health Administration and WorkSafe New Zealand each address excavators that lift.

Great Britain: HSE on excavators in tree work

HSE's excavators page covers tracked 360-degree excavators and walking excavators in forestry and other tree work. When the machine is used for lifting, the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply. HSE gives two examples where the excavator may need a current certificate of thorough examination: cable crane operations and lowering culvert pipes.

Before work starts, HSE wants a risk assessment that shows whether the machine suits the site and the task. It lists site conditions, terrain, weather, operation and parking, maintenance, transport, preparation to work and emergency procedures. HSE also flags the operator's risk of falling during on-site maintenance and refuelling, and calls for suitable access and safe working positions.

All operators must receive appropriate training in running the machine and doing the tasks. HSE names a relevant NPTC FMOC qualification for the type of excavator work being done.

What a LOLER thorough examination is

HSE's page on thorough examinations describes it as a systematic and detailed examination of the equipment and its safety-critical parts, by a competent person at set intervals, followed by a written report. The report records the examination date, the date the next one is due and any defect that is or could become a danger. Serious defects go to the dutyholder verbally at once, with a copy of the written report sent to the enforcing authority.

EquipmentInterval HSE gives when no examination scheme sets another
Lifting equipment and its accessories used to lift peopleEvery 6 months
All lifting accessoriesEvery 6 months
All other lifting equipmentEvery 12 months

HSE adds examinations before first use, after assembly at each location, and after exceptional circumstances such as damage, long periods out of use or major modification.

United States: the crane rule and its exclusion

Under 29 CFR 1926.1400, the construction crane and derrick standard covers power-operated equipment that can hoist, lower and horizontally move a suspended load. Paragraph (c)(2) excludes power shovels, excavators, wheel loaders, backhoes, loader backhoes and track loaders. The same paragraph says the machinery stays excluded when used with chains, slings or other rigging to lift suspended loads.

Paragraph (c)(1) separately excludes covered machinery that has been converted for non-lifting use, and names power shovels, excavators and concrete pumps as examples.

OSHA's Safety and Health Information Bulletin 01-12-2009 on skid-steer loaders lists the seatbelt, falling object and roll-over protective structures and the control interlock system as common safety features. It says such earth-moving loaders are not covered by the Powered Industrial Truck standard, 29 CFR 1910.178. OSHA's records for 1997 to 2007 hold 100 skid-steer accidents, and bypassed safety devices were the direct cause of 20 percent.

New Zealand: the 2015 gazette notice

WorkSafe New Zealand published a notice in the New Zealand Gazette on September 24, 2015, under regulation 6 of the 1999 pressure equipment, cranes and passenger ropeways regulations. It cancelled a December 12, 2013 exemption for mobile plant, including earth-moving equipment, not originally designed as a crane and used for lifting incidental to its main function. From the same date it exempted that plant fully, on conditions.

  • Lifting points and rigging equipment are certified by a Chartered Professional Engineer.
  • For hydraulic excavators with an operating weight of seven tonnes or more, the machine is not modified to work as a crane beyond a lifting point.
  • Those excavators carry a loading chart for operators, and operators and ground support personnel are adequately trained.
  • Work follows the Approved Code of Practice for Load-Lifting Rigging.
  • Hose burst protection valves are required after January 1, 2016, except on load-lifting mobile plant in forestry operations that do not involve building forest roads.

Sources