Crane slings, chains and rigging for tree picks: what OSHA 1910.184 and ASME B30.9 say
OSHA 1910.184 covers five kinds of sling, each with its own marking, temperature and removal rules, and prints one table, for chain wear. ASME B30.9 covers the same kinds plus polyester yarn slings. HSE adds marking and examination duties in Great Britain.
Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.
The named codes and regulators are described here as published. It is not training and does not teach the work. OSHA and ASME cover slings in general, not tree removal by crane. OSHA's text is in 29 CFR 1910.184, Slings, and ASME's volume is B30.9, Slings.
Slings in the OSHA section
The OSHA section applies to slings used with other material handling equipment to move material by hoisting. It defines a sling as an assembly that connects the load to the material handling equipment. Five kinds are covered: alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope of conventional three-strand construction, and synthetic web in nylon, polyester and polypropylene. Its definitions include the basket hitch, choker hitch and vertical hitch, the master link or gathering ring, and the angle of loading, which it measures from the horizontal or vertical plane.
Practices that apply to every sling
Paragraph (c) lists practices for whenever any sling is used. Damaged or defective slings are not used. Slings are not shortened with knots, bolts or other makeshift devices, and sling legs are not kinked. A sling is not loaded beyond its rated capacity, and the employer must not load it beyond the safe working load the manufacturer gives on the identification markings permanently affixed to it. Slings without affixed, legible identification markings are not used.
The paragraph also covers use. A basket hitch has its load balanced to prevent slippage. Slings are securely attached to loads, padded or protected from sharp edges, and not pulled from under a load resting on them. Suspended loads are kept clear of obstructions, and employees are kept clear of loads about to be lifted and of suspended loads. Shock loading is prohibited.
Paragraph (d) calls for a daily inspection of the sling and all fastenings and attachments by a competent person designated by the employer, with more inspections during use where service conditions warrant. Damaged or defective slings are removed from service immediately.
By sling type
| Type | Identification | Temperature figures |
|---|---|---|
| Alloy steel chain | Size, grade, rated capacity and reach | Removed for good above 1000 °F; working load limits reduced above 600 °F |
| Wire rope | Safe working load for each hitch used, the angle it is based on, and the number of legs if more than one | Fiber core slings removed for good above 200 °F; manufacturer's advice above 400 °F or below minus 60 °F for other cores |
| Metal mesh | Rated capacity for vertical, basket and choker hitch | Minus 20 °F to 550 °F without reducing the limit if not impregnated; zero to 200 °F if PVC or neoprene impregnated |
| Fiber rope | Rated capacity for each hitch used, the angle, the fiber material and the number of legs | Minus 20 °F to 180 °F without reducing the limit, except wet frozen slings |
| Synthetic web | Rated capacities for each hitch and web material, by marking or code | Nylon and polyester webs not above 180 °F; polypropylene not above 200 °F |
Conditions that remove a sling
- Alloy steel chain. A link below the minimum size in Table N-184-1, cracked or deformed master or coupling links, hooks opened more than 15 percent of the throat opening or twisted more than 10 degrees. A thorough periodic inspection comes at no more than 12 months, with a record of the most recent month, and new, repaired or reconditioned chain slings are proof tested by the manufacturer or an equivalent entity.
- Wire rope. Ten randomly distributed broken wires in one rope lay, or five in one strand. Wear of one-third of the outside wires' original diameter. Kinking, crushing or bird caging, heat damage, cracked or worn end attachments, corrosion, and the same hook limits as chain.
- Metal mesh. A broken weld or brazed joint along the edge, a 25 percent reduction in wire diameter from abrasion or 15 percent from corrosion, lost flexibility, and distorted handles.
- Fiber rope. Abnormal wear, powdered fiber between strands, broken or cut fibers, variations in the size or roundness of strands, discoloration or rotting, and distorted hardware. Only slings made from new rope are used, and repaired fiber rope slings are prohibited.
- Synthetic web. Acid or caustic burns, melting or charring, snags, punctures, tears or cuts, broken or worn stitches, and distorted fittings.
The one table
Table N-184-1 lists the minimum allowable chain size at any point of a link, for chain sizes from 1/4 inch to 1 3/4 inch. It is the only table in 1910.184. The section prints no capacity table. Rated capacities come from the manufacturer's identification markings that the section requires on each sling.
ASME B30.9
ASME lists B30.9 Slings, 2025 edition. ASME describes the volume as provisions for the fabrication, attachment, use, inspection, testing and maintenance of slings used for load handling with equipment described in other B30 volumes, except as restricted in B30.12 and B30.23. It addresses slings of alloy steel chain, wire rope, metal mesh, synthetic fiber rope, synthetic webbing, and polyester fiber yarns in a protective cover. ASME says the standard has been placed on stabilized maintenance and is intended for manufacturers, owners, employers and users. The catalogue page carries no capacity table.
Great Britain: HSE and LOLER
HSE's page on lifting equipment in forestry says every item of lifting equipment, including accessories, must carry a clear mark of its safe working load. It lists lifting items with chains, slings or hooks among the uses needing a strength check. Slings and shackles used in the rigging and support of cable cranes should have their safe working load marked, and labels or colour coding are acceptable. Where polypropylene chokers of different strengths are used, they have to be distinguishable from each other.
Under regulation 9 of the Lifting Operations and Lifting Equipment Regulations 1998, an accessory for lifting is thoroughly examined at least every 6 months, or under an examination scheme. Regulation 11 keeps the report of a first examination of an accessory available for two years after it is made. HSE's code L113 is the approved code of practice and guidance for those regulations, second edition, December 2014, with amendments in 2018.
Sources
- eCFR, 29 CFR 1910.184 Slings, current text, read October 19, 2026
- ASME, B30.9 Slings, 2025 edition, catalogue page, read October 19, 2026
- HSE, Lifting equipment in forestry, read October 19, 2026
- HSE, Safe use of lifting equipment, L113 (second edition, December 2014, amendments 2018), read October 19, 2026
- legislation.gov.uk, The Lifting Operations and Lifting Equipment Regulations 1998, SI 1998 No. 2307, read October 19, 2026