Disaster terms for tree contractors: emergency work, projects, direct assistance, NIMS

Federal rules give emergency work, permanent work, a project and direct assistance their own meanings. 44 CFR 206.201, 49 CFR 390.23 and the FEMA NIMS page set them out.

Checked against the sources at the bottom of this page on October 21, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. The grant terms below come from 44 CFR 206.201, the FEMA rule on disaster assistance. The driver terms come from 49 CFR 390.23, the federal rule on automatic relief from motor carrier regulations in an emergency.

Grant terms in 44 CFR 206.201

Section 206.201 holds the definitions used in its subpart. It spells out Project Worksheet and Public Assistance in full and does not define PA or PW as abbreviations. The rule was last amended on January 3, 2017. Debris contractors meet these terms on FEMA Public Assistance debris projects.

TermMeaning in 44 CFR 206.201
ApplicantA State agency, local government or eligible private nonprofit organization that submits an application to the recipient for assistance under the State's grant
Emergency workWork that must be done immediately to save lives and protect improved property and public health and safety, or to avert or lessen the threat of a major disaster
Permanent workRestorative work done through repairs or replacement to restore an eligible facility to its predisaster design and current applicable standards
FacilityAny publicly or privately owned building, works, system or equipment, built or manufactured, or an improved and maintained natural feature. Land used for agricultural purposes is not a facility
ProjectA logical grouping of work required as a result of the declared major disaster or emergency. Its scope of work and cost estimate are documented on a Project Worksheet (FEMA Form 90-91). A project may include eligible work at several sites
Project approvalThe Regional Administrator or a designee reviews and signs an approval of work and costs on a Project Worksheet or a batch of them. The approval is also an obligation of funds to the recipient
RecipientThe government that receives the grant and answers for the use of the funds. The State for which the emergency or major disaster is declared is usually the recipient. A Tribal government may be the recipient or a subrecipient
SubrecipientThe government or other legal entity that receives a subgrant and answers to the recipient for the use of the funds
Hazard mitigationAny cost effective measure that reduces the potential for damage to a facility from a disaster event

Two points in the project entry matter to a contractor's paperwork. FEMA must approve a scope of eligible work and an itemized cost estimate before funding a project. The rule also treats approval as the moment funds are obligated.

The FEMA glossary prints a different meaning for the same word. Its Applicant entry is an individual or the head of a household who has applied for federal disaster assistance, citing 44 CFR 206.111.

Driver terms in 49 CFR 390.23

Section 390.23 is headed Automatic relief from regulations. It applies to a motor carrier or driver providing direct assistance during a declared emergency. The text does not use the terms commercial driver's license or CDL waiver. It names the relief by section numbers of the chapter.

DeclarationRules set asideLength of relief
Emergency declared by the President under 42 U.S.C. 5191(b)Parts 390 through 399 of the chapter, or any section of themThe shorter of the emergency period and 30 days from the initial declaration
Emergency declared by a State Governor, the Governor's representative or FMCSASections 395.3 and 395.5The shorter of the emergency period and 30 days from the initial declaration
Emergency declared by a Federal, State or local official with that authoritySections 395.3 and 395.5The shorter of the period of assistance and 5 days from the initial declaration
Tow trucks requested by a police officer to move wrecked or disabled vehiclesSection 395.3The shorter of the length of assistance and 24 hours from the request

Direct assistance ends when a driver or vehicle carries cargo in interstate commerce that is not destined for the relief effort, or when the carrier dispatches the driver or vehicle elsewhere to begin operations in commerce. After it ends, a driver may return empty to the terminal or normal reporting location. A driver who reports needing immediate rest must be allowed at least 10 consecutive hours off duty before returning. Travel across state lines for storm work is covered in the guide to travelling to disaster work.

A separate 49 CFR 390.23 paragraph covers residential heating fuel shortages. A Governor's declaration there can run 30 days, with up to two further 30-day extensions and a total of 90 days.

NIMS, resource typing and mutual aid

FEMA's National Incident Management System page says NIMS guides all levels of government, nongovernmental organizations and the private sector to work together. Local, state, territorial and tribal jurisdictions must adopt NIMS to receive federal preparedness grants. Tools listed under NIMS are the National Qualification System, Resource Typing, Mutual Aid, and Command and Coordination Structures. Mutual aid is named without a definition. The glossary of storm, debris and emergency words carries more tree-work terms.