Ground protection over roots during works: mulch, fencing and geocells

A university specification sets fencing, a 3-inch mulch layer and a no-traffic zone over roots. The Arboricultural Association has a guidance note on cellular confinement under surfacing. ANSI A300 Part 5 and BS 5837:2012 cover trees during construction in the US and the UK.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. It draws on the Tree Care Industry Association's page for ANSI A300 Part 5, the British Standards Institution's catalogue entry for BS 5837:2012, a University of Arizona specification and an Arboricultural Association news item. The standards themselves are sold. Trees and construction has its own page.

The two standards

The Tree Care Industry Association says Part 5 of the A300 standards applies to management, and the writing of management plans, for trees during site planning, development and construction. Its list of topics includes tree protection practices before and during demolition, construction and landscaping, barriers, demolition, disposal of building waste, fill soil (grade change), excavation and trenching, utilities, and pavement.

The BSI Knowledge page lists BS 5837:2012, Trees in relation to design, demolition and construction. Recommendations, published 30 April 2012, with the status Current, Under Review. BSI calls it a British standard giving recommendations relating to tree care so new construction or existing structures and their surrounding trees have a harmonious and sustainable relationship. Its recommendations can be applied whether or not planning permission is required. The 2012 edition supersedes BS 5837:2005, which is withdrawn. BSI names arboriculturists, architects, builders, landscape architects, land managers, contractors and statutory undertakers as its users.

The University of Arizona specification

Section 02910, Temporary Tree and Plant Protection, in the University of Arizona Manual of Design and Specification Standards (dated June 2011), is a worked example of what a specification requires. It defines the tree protection zone as the area inside the drip line of a tree or group of trees to remain. The products it names are chain-link fence panels for temporary fencing and coarse bark mulch to cover the area under protected trees.

Section 02910 requirements inside the tree protection zone
ItemWording of the specification
FencingTemporary fencing is installed around tree protection zones, maintained, and removed when construction is complete.
MulchTree protection areas are mulched with organic matter to a depth of 3 inches.
TrafficVehicles or foot traffic are not permitted within tree protection zones, to prevent soil compaction over root systems.
StorageConstruction materials, debris and excavated material are not stored inside the zone, and portable restrooms are placed outside it.
IrrigationRegular irrigation of protected trees is arranged with the Owner.
Excavation and trenchesWork inside the zone does not proceed without the Owner's written approval. Roots are exposed by hand clearing with narrow-tine spading forks.
Grade changeWhere the existing grade is 6 inches or less below finish grade, topsoil goes in a single un-compacted layer. Beyond 6 inches, retaining walls keep the original grade under the tree.

The specification also calls for the Owner's Certified Arborist to be consulted before any root larger than 1 inch in diameter is pruned.

Cellular confinement under surfacing

The Arboricultural Association news item on Guidance Note 12, The Use of Cellular Confinement Systems near Trees, says soil stripping can damage tree roots, and compaction or sealing from above can reduce the volume of soil available to a tree. New hard surfacing within root protection areas should only be specified when other alternatives are not feasible. Where no-dig surfacing is required near trees, it calls a cellular confinement sub-base the most used approach, with piled rafts and stone-filled wire gabions as alternatives.

Guidance Note 12 stipulates high-density polyethylene geocells in preference to flexible geotextile ones. It describes suitable infill materials and says the final top dressing needs to be permeable. Every installation, it says, needs a project-specific arboricultural method statement, and ground preparation is strongly recommended to be done under arboricultural supervision. The only earlier guidance, it says, was Arboricultural Practice Note 12, a short guide of 2007.