Home-built and unrated lowering gear: what the codes say about untested equipment
None of the codes named here mentions home-built lowering gear. The UK lifting regulations, OSHA's sling standard and the NSW, New Zealand and UK codes each tie lifting or lowering equipment to a rating, and most add markings, testing or examination.
Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. This page draws on the UK Lifting Operations and Lifting Equipment Regulations 1998, OSHA's sling standard and three tree work codes. It is not training and does not teach the work. How the codes treat lowering itself is in lowering loads, and marking on bought gear is in counterfeit and unmarked climbing gear.
United Kingdom: LOLER
The HSE page on the Lifting Operations and Lifting Equipment Regulations (LOLER) is an index to its guidance on safe lifting, planning, lifting people and thorough examination. The Regulations themselves are SI 1998 No. 2307 on legislation.gov.uk. They define lifting equipment as work equipment for lifting or lowering loads, including attachments used for anchoring, fixing or supporting it. An accessory for lifting is lifting equipment for attaching loads to machinery for lifting.
Regulation 4 requires an employer to see that lifting equipment is of adequate strength and stability for each load. Regulation 7 requires accessories for lifting to be marked so that the characteristics needed for safe use can be identified. Machinery for lifting loads is marked with its safe working load.
Regulation 9 covers thorough examination by a competent person. New equipment is examined before first use unless it has not been used before and the employer holds a declaration of conformity made not more than 12 months earlier. After that, lifting equipment exposed to conditions causing deterioration liable to result in dangerous situations is examined: an accessory for lifting at least every 6 months and other lifting equipment at least every 12 months, or under an examination scheme. Equipment obtained from another undertaking must come with physical evidence of its last thorough examination. Regulation 3 extends the duties to the self-employed and to anyone with control over the equipment or its use.
The Arboricultural Association's Industry Code of Practice, Tree Work at Height (edition 2, May 2020), applies the same regulations. It puts lowering devices under a performance specification: rated for the anticipated loads, including dynamic loading during rigging, and compatible with neighbouring components. Alterations or modifications belong to the manufacturer, or to a competent person with the manufacturer's consent. A load rating is among the markings listed for equipment, and information on load ratings is among the records kept for each item.
United States: OSHA 1910.184
OSHA's sling standard, 29 CFR 1910.184, covers slings made from alloy steel chain, wire rope, metal mesh, fiber rope and synthetic web. Its text on markings, makeshift fittings and testing includes:
- Employers must not use slings without affixed and legible identification markings, and must not load a sling beyond the safe working load on those markings.
- Slings must not be shortened with knots, bolts or other makeshift devices. Makeshift links or fasteners formed from bolts or rods must not be used on alloy steel chain.
- The standard defines a proof test as a nondestructive tension test performed by the sling manufacturer or an equivalent entity to verify construction and workmanship.
- Each new, repaired or reconditioned alloy steel chain sling is proof tested before use, and the employer retains the certificate. Welded end attachments on wire rope slings are proof tested at twice rated capacity by the manufacturer or an equivalent entity.
- Only fiber rope slings made from new rope are used. Repaired or reconditioned fiber rope slings are prohibited.
New South Wales: Tree works code of practice
SafeWork NSW's Tree works code of practice, March 2026, commenced on March 27, 2026. Its chapter on lowering says lowering equipment should be proprietary manufactured and load rated, with the rated strength determined before use. Only rated equipment designed for lifting, lowering or pulling loads should be used for tree work.
The code says the rated strength of lowering equipment should be known on site. It names four ways to record it: temporary labelling on the equipment or packaging, permanent labelling stitched, stamped or plated on, the manufacturer's manual, and a lifting equipment register. Lowering devices should be modified or repaired only by the manufacturer. Connection hardware should be labelled with its age and working load limit, and the code says a karabiner or shackle should not be used in place of a pulley. A lowering system is described as only as strong as its weakest component.
New Zealand: Approved Code of Practice
WorkSafe New Zealand's Approved Code of Practice, Safety and Health in Arboriculture (November 2012), defines the safe working load as that specified by the manufacturer. Line pull must not exceed the safe working load of the rope or its accessories, and for arboricultural operations that load is one-sixth of the breaking strength. No wire rope is used unless the manufacturer or vendor has certified its breaking strength. Tackle blocks, pulleys and their connecting links, chokers, slings and other attachments are inspected before use.
Who certifies a rating
| Source | Who the text names |
|---|---|
| LOLER (UK) | A competent person carries out thorough examination; the employer holds a declaration of conformity or an examination record |
| OSHA 1910.184 (US) | The sling manufacturer or an equivalent entity proof tests and repairs; the employer keeps the certificate |
| SafeWork NSW code | The manufacturer for modification and repair; load rating shown by label, manual or register |
| WorkSafe NZ code | The manufacturer specifies the safe working load; the manufacturer or vendor certifies wire rope breaking strength |
| Arboricultural Association code (UK) | The manufacturer or a competent person with the manufacturer's consent for any alteration |
Sources
- HSE, Lifting Operations and Lifting Equipment Regulations (LOLER), page updated March 16, 2023, read October 16, 2026
- legislation.gov.uk, The Lifting Operations and Lifting Equipment Regulations 1998, SI 1998/2307, regulations 2, 3, 4, 7 and 9, read October 16, 2026
- eCFR, 29 CFR 1910.184 Slings, current text, read October 16, 2026
- SafeWork NSW, Tree works code of practice, March 2026, read October 16, 2026
- WorkSafe New Zealand, Approved Code of Practice for Safety and Health in Arboriculture, November 2012, read October 16, 2026
- Arboricultural Association, Industry Code of Practice for Arboriculture: Tree Work at Height, edition 2, May 2020, read October 16, 2026