New Zealand tree and power line zones: growth limit, cut-back and notice zones after the 2024 amendment
New Zealand's Electricity (Hazards from Trees) Regulations set three zones around a power line. The cut-back zone adds 1 m to the growth limit zone, and the notice zone adds 2 m.
Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. Two lines companies, WEL Networks and Top Energy, explain the Electricity (Hazards from Trees) Regulations 2003 as amended in 2024. WorkSafe New Zealand Energy Safety, the regulator for electricity under the Electricity Act 1992, also covers the amendment. Related rules are in trees touching power lines in New Zealand.
The three zones
WEL Networks describes three zones around a power line. The growth limit zone is the space around the line that must be kept clear of vegetation. Its size and shape depend on the line voltage and, in some cases, the span length.
The cut-back zone extends 1 m out from the growth limit zone. A tree growing into the growth limit zone is trimmed back far enough to reach the cut-back zone, unless a dispensation applies. The hazard warning notice zone extends 2 m out from the growth limit zone. Top Energy gives the same three zones.
WorkSafe Energy Safety lists the 2024 amendment as an extended notice zone, a new cut-back zone one metre outside the growth limit zone, and a growth limit zone that is clear to the sky for high voltage lines.
Distances by line voltage
WEL Networks prints one table, measured from the power line and not the pole. The distances are minimums and apply in all conditions, including high wind.
| Line voltage | Growth limit zone | Cut-back zone | Notice zone |
|---|---|---|---|
| Low voltage (230 to 400 V) | 0.5 m | 1.5 m | 2.5 m |
| High voltage (11 kV) | 1.6 m | 2.6 m | 3.6 m |
| High voltage (22 to 33 kV) | 2.5 m | 3.5 m | 4.5 m |
| High voltage (110 kV or more) | 4.0 m | 5.0 m | 6.0 m |
Most lines running to a house are low voltage, and lines down a street may be low or high voltage. For spans longer than 150 m, additional clearances apply. The growth limit zone grew by one metre, and WEL may apply the previous minimum clearance until 16 October 2026.
Clear to the sky
For some lines the growth limit zone runs up without a ceiling. WEL Networks' leaflet applies this to every line of 33 kV or more, plus certain high risk lines at 11 or 22 kV. Trees protected by district plans are excluded from the requirement.
The two lines companies word the change for lower voltage lines differently. Top Energy writes that from 17 October 2026 clear to the sky also applies to lines at 11 kV or below outside urban areas. WEL Networks' web page words it as "since 17 October 2026".
Notices and who serves them
The lines company serves the notices. Top Energy lists its duties as line and vegetation surveys, information about the rules, hazard warning notices and cut or trim notices where the regulations allow or require them, and responding to electricity hazards.
| Notice | Trigger | What it means |
|---|---|---|
| Hazard warning notice | Vegetation enters the notice zone | A warning that the tree is getting close |
| Cut or trim notice | Vegetation enters the growth limit zone | The tree is cut back as the notice requires |
| Treefall hazard notice | Written arborist advice rates a tree in the treefall hazard area as a moderate or high hazard | Removal within 45 working days (moderate) or 25 working days (high); formal notices not before 23 July 2028 |
The treefall hazard area extends 24 m from the growth limit zone. A tree inside it is not automatically a hazard. A low height planting rule starts on 23 July 2027 and bars planting a tree expected to grow taller than its distance from the line, within 24 m horizontally. It does not apply on existing forest land, in urban areas, to shelterbelts or on Conservation Act land.
If a tree qualifies for its first cut or trim, the lines company meets the reasonable cost. After that the tree owner is responsible for keeping the tree clear and paying for trimming.
Penalties and work near the line
Top Energy states that a tree owner may commit an offence without a reasonable excuse in two cases. One is not having a tree cut or trimmed as a cut or trim notice requires. The other is not telling the lines company the time and location of the work at least three working days before it takes place. A conviction carries a fine of up to NZ$10,000, and up to NZ$500 for each further day or part of a day. WEL Networks' leaflet prints the same figures.
The WEL Networks leaflet says only qualified utility arborists are permitted to trim a tree within four metres of a WEL power line. Disputes over some notices can go to the Tree Arbitrator, which the WorkSafe website lists.
Sources
- WEL Networks, Clearances (tree regulations zones and clear to the sky), read October 15, 2026
- Top Energy, Trees and lines (notices, offences, treefall hazard and planting rules), read October 15, 2026
- WorkSafe New Zealand Energy Safety, Energy safety update, Electricity Engineers' Association health and safety workshop, July 16, 2025, read October 15, 2026
- WEL Networks, Trees and power lines information leaflet, read October 15, 2026