Why bid prices vary: the cost elements printed on public tree bid sheets
Public tree bid sheets itemize crew hours, equipment, mobilization, traffic control, debris, tree size, site type and sales tax. Four sheets from Clark County, Washington and NCDOT show each element with the bidders' printed prices.
Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.
Public tree bid sheets break a job into lines: crew hours, equipment, mobilization, traffic control, debris disposal, tree size, site type and sales tax. Four sheets show those lines with each bidder's printed prices. Bidders are lettered in each sheet's order, and the prices are agency contract bids, not market quotes.
Crew hours
Clark County's Invitation to Bid #2803, On-Call Tree Services, prices a three-person crew including a certified arborist, with all required equipment and supplies, by the hour. The hour begins when the crew steps on site, and no travel time is included. The rate includes disposal of debris. Only the apparent low bidder, A, prints prices: US$360.00 an hour in Schedule A, tree pruning, and US$385.00 an hour in Schedule B, tree removal services.
Each schedule has two lines at the same rate, one for a 24 hour response time and one for an emergency response time of 1 hour. The approximate yearly quantities are 1,200 and 200 hours for pruning and 600 and 200 hours for removal.
Schedule C lists twelve hourly rates for additional services. Bidder A's prices are below.
| Schedule C line (approximate hours a year) | Rate per hour |
|---|---|
| Tree Trimmer Foreman (160) | US$110.00 |
| Tree Trimmer (160) | US$110.00 |
| Tree Trimmer Ground Person (80) | US$100.00 |
| Aerial Devices & Equipment, 60/70 Feet (80) | US$100.00 |
| Aerial Devices & Equipment, 39 Feet (80) | US$100.00 |
| Chipper (160) | US$100.00 |
| Chipper Dump Truck (160) | US$100.00 |
| Stump Grinding (24) | US$100.00 |
| Arborist (8) | US$110.00 |
| Tree Installation / Replacement (8) | US$100.00 |
| Stump Treatment (8) | US$75.00 |
| Herbicide Treatment for Noxious Trees (8) | US$100.00 |
The county adds Washington State sales tax (code 0666) at 8.5 percent below each schedule's sub-total.
Equipment, traffic control and overhang clearing
NCDOT contract D6D3.SBE.016, dated August 21, 2024, covers Tree Removal, Stump Grinding & Overhang Clearing in Bladen and Columbus counties. Seven bidders priced 17 lines. Equipment is priced as crews by the hour, and traffic control by the day. The NCDOT sheets print no sales tax line.
| NCDOT D6D3.SBE.016 line (quantity) | Unit price |
|---|---|
| 2 Bucket Truck with Chainsaw Crew, hour (160) | A US$200.00; B US$120.00; C US$150.00; D US$125.00; E US$300.00; F US$230.00; G US$795.00 |
| 3 Truck with Chipper and Chipper Crew, hour (80) | A US$150.00; B US$150.00; C US$200.00; D US$150.00; E US$250.00; F US$250.00; G US$595.00 |
| 17 Traffic Control, day (20) | A US$500.00; B US$1,200.00; C US$800.00; D US$1,000.00; E US$1,000.00; F US$1,500.00; G US$595.00 |
| 16 Overhang Clearing, linear foot (500) | A US$3.00; B US$2.00; C US$5.00; D US$1.00; E US$5.00; F US$12.00; G US$845.00 |
Mobilization
Mobilization is its own line on both NCDOT sheets. On D6D2.SBE.005, dated August 22, 2019, six bidders priced an emergency mobilization and a mobilization quantity of 40 each.
| Mobilization line (quantity) | Unit price |
|---|---|
| D6D3.SBE.016, 1 Emergency Mobilization, day (3) | A US$1,000.00; B US$1,500.00; C US$1,000.00; D US$1,000.00; E US$1.00; F US$1,000.00; G US$2,995.00 |
| D6D2.SBE.005, 20 Emergency Mobilization, each (1) | A US$100.00; B US$1,500.00; C US$500.00; D US$1.00; E US$100.00; F US$5,000.00 |
| D6D2.SBE.005, 21 Mobilization, each (40) | A US$0.00; B US$200.00; C US$800.00; D US$900.00; E US$800.00; F US$1,475.00 |
Tree size and site
Both agencies price tree removal by size. NCDOT's 2024 sheet uses six diameter bands, and no bidder prints a lower price for a larger band.
| NCDOT D6D3.SBE.016 tree removal (quantity) | Unit price, each |
|---|---|
| 4 Tree Removal, 0 to 10 inches (5) | A US$150.00; B US$150.00; C US$200.00; D US$100.00; E US$200.00; F US$800.00; G US$745.00 |
| 5 Tree Removal, 11 to 20 inches (10) | A US$300.00; B US$500.00; C US$500.00; D US$500.00; E US$400.00; F US$1,000.00; G US$945.00 |
| 6 Tree Removal, 21 to 30 inches (10) | A US$600.00; B US$700.00; C US$800.00; D US$800.00; E US$700.00; F US$1,200.00; G US$1,495.00 |
| 7 Tree Removal, 31 to 40 inches (5) | A US$800.00; B US$900.00; C US$1,000.00; D US$800.00; E US$1,350.00; F US$3,000.00; G US$2,195.00 |
| 8 Tree Removal, 41 to 50 inches (1) | A US$2,000.00; B US$1,200.00; C US$1,500.00; D US$1,200.00; E US$1,850.00; F US$6,000.00; G US$3,495.00 |
| 9 Tree Removal, over 50 inches (1) | A US$3,000.00; B US$1,500.00; C US$1,800.00; D US$2,000.00; E US$2,500.00; F US$10,000.00; G US$3,995.00 |
Clark County's bid #2714, On-Call Hazard Tree Removal, opened October 27, 2020, prices the same three DBH bands twice, once for developed parks and lands and once for undeveloped parks and lands.
| Clark #2714 tree removal | Developed parks and lands | Undeveloped parks and lands |
|---|---|---|
| 6.0 to 15.9 in DBH | A US$200.00; B US$250.00; C US$700.00 | A US$150.00; B US$200.00; C US$775.00 |
| 16 to 30 in DBH | A US$350.00; B US$550.00; C US$875.00 | A US$275.00; B US$300.00; C US$925.00 |
| Over 30 in DBH | A US$475.00; B US$850.00; C US$1,200.00 | A US$350.00; B US$500.00; C US$1,300.00 |
Debris and tax
Bid #2714 prices debris removal on its own lines.
| Clark #2714 debris line (estimated quantity) | Unit price, each |
|---|---|
| Removal of debris for tree removal, developed (36) | A US$75.00; B US$150.00; C US$600.00 |
| Removal of debris for stump grinding & removal (12) | A US$75.00; B US$100.00; C US$255.00 |
| Removal of debris for tree removal, undeveloped (24) | A US$75.00; B US$125.00; C US$650.00 |
The county adds Washington State sales tax at 8.4 percent to that sheet's sub-total. Bidder A's sub-total of US$24,675.00 and tax of US$2,072.70 give a net total bid of US$26,747.70. Bidder B's net total is US$39,538.90 and Bidder C's is US$107,364.78.
Sources
- Clark County, Washington, invitation to bid 2803 tab sheet, on-call tree services, read October 15, 2026
- North Carolina Department of Transportation, Division 6 bid tabulation D6D3.SBE.016, August 2024, read October 15, 2026
- Clark County, Washington, bid 2714 tab sheet, on-call hazard tree removal, read October 15, 2026
- North Carolina Department of Transportation, Division 6 bid tabulation D6D2.SBE.005, August 2019, read October 15, 2026