Public tree contract bid: City of Yakima, Washington, tree trimming, pruning and removal, June 2025

The City of Yakima, Washington opened quotes on June 20, 2025 for five years of tree trimming, pruning and removal at crew hour and day rates. Four bidders priced 17 lines. Every price on the sheet is shown below.

Checked against the sources at the bottom of this page on October 9, 2026. Rules, fees and pay change: the source has the last word.

This page shows one public bid tabulation as the city published it. These are government contract prices on one sheet, not market quotes and not advice. The bidders are shown as Bidder A, Bidder B, Bidder C and Bidder D in the order the sheet lists them. The sheet itself names the firms and is linked below. The wider picture is on the public tree contract bids page.

The contract

FactWhat the sheet says
AgencyCity of Yakima, Washington, for streets and parks
Project number22533
WorkTree trimming, pruning and removal services
Sheet titleQuote tabulation and comparison sheet
Quotes openedJune 20, 2025 at 2:00 p.m.
Contract term5 years, August 5, 2025 to August 4, 2030
Digital signature stampsJune 30, 2025 and July 1, 2025
Bidders on the sheet4
Award recommendation printedSchedule 1 regular rates to one firm, and schedule 1 emergency rates and schedule 2 stump grinding to another, as the lowest responsive bid from a responsible bidder for each schedule. Schedules 3 and 4 are used as needed from each awarded contractor
TaxA Sales tax line (WSST) below the sub-total, labelled 8.3 percent

What the sheet shows about the lines

The sheet prices crew time, not trees. Schedule 1 has hour and day rates for a two-person crew with equipment, and for each additional crew person, once as regular rates and once as emergency rates. Schedule 2 has the same four rates for stump grinding. Schedule 3 prices travel by the mile outside the city limits for a boom truck and a regular truck, in addition to the regular rates. Schedule 4 prices traffic control by the hour, and the sheet says those unit prices apply only for additions or deletions to the traffic control work and that the city can reject any of them.

Every line has a quantity of 1. So each printed sub-total is the plain sum of the unit prices in its column and is not an estimate of what the city will spend. The sheet adds the five schedule sub-totals, then the sales tax line, to reach a grand total base bid. That total is a comparison device, and the contract itself is for hourly and daily rates over five years. The tax line printed for Bidder D is 8.2 percent of its sub-total, where the other three lines are 8.3 percent of theirs. The page shows the numbers as printed.

Prices as printed

Each bidder wrote one unit price per line. Where the sheet shows a total beside a unit price, it is the same number because the quantity is 1.

Schedule 1, regular rates

Line and itemBidder ABidder B
1. Trimming, pruning or removal, two-person crew with equipment, per hourUS$260.00US$248.00
2. Same crew, per day (based on an 8 hour work day)US$2,080.00US$1,984.00
3. Each extra crew person with equipment, per hourUS$75.00US$78.00
4. Each extra crew person with equipment, per dayUS$600.00US$624.00
Sheet sub-total, schedule 1 regularUS$3,015.00US$2,934.00
Line and itemBidder CBidder D
1. Trimming, pruning or removal, two-person crew with equipment, per hourUS$300.00US$220.00
2. Same crew, per day (based on an 8 hour work day)US$2,400.00US$1,760.00
3. Each extra crew person with equipment, per hourUS$95.00US$95.00
4. Each extra crew person with equipment, per dayUS$760.00US$760.00
Sheet sub-total, schedule 1 regularUS$3,555.00US$2,835.00

Schedule 1, emergency rates

Line and itemBidder ABidder B
5. Trimming, pruning or removal, two-person crew with equipment, per hourUS$260.00US$248.00
6. Same crew, per day (based on an 8 hour work day)US$2,080.00US$1,984.00
7. Each extra crew person with equipment, per hourUS$75.00US$78.00
8. Each extra crew person with equipment, per dayUS$600.00US$624.00
Sheet sub-total, schedule 1 emergencyUS$3,015.00US$2,934.00
Line and itemBidder CBidder D
5. Trimming, pruning or removal, two-person crew with equipment, per hourUS$375.00US$320.00
6. Same crew, per day (based on an 8 hour work day)US$3,000.00US$2,560.00
7. Each extra crew person with equipment, per hourUS$125.00US$95.00
8. Each extra crew person with equipment, per dayUS$1,000.00US$760.00
Sheet sub-total, schedule 1 emergencyUS$4,500.00US$3,735.00

Schedule 2, stump grinding, regular rates

Line and itemBidder ABidder B
9. Stump grinding, two-person crew with equipment, per hourUS$190.00US$160.00
10. Same crew, per day (based on an 8 hour day)US$1,520.00US$1,280.00
11. Each extra crew person with equipment, per hourUS$75.00US$80.00
12. Each extra crew person with equipment, per dayUS$600.00US$640.00
Sheet sub-total, schedule 2US$2,385.00US$2,160.00
Line and itemBidder CBidder D
9. Stump grinding, two-person crew with equipment, per hourUS$225.00US$195.00
10. Same crew, per day (based on an 8 hour day)US$1,800.00US$1,560.00
11. Each extra crew person with equipment, per hourUS$100.00US$95.00
12. Each extra crew person with equipment, per dayUS$800.00US$760.00
Sheet sub-total, schedule 2US$2,925.00US$2,610.00

Schedule 3, outside city limits, travel in addition to regular rates

Line and itemBidder ABidder B
13. Boom truck, per mileUS$0.00US$0.00
14. Regular truck, per mileUS$0.00US$0.00
Sheet sub-total, schedule 3US$0.00US$0.00
Line and itemBidder CBidder D
13. Boom truck, per mileUS$0.35US$0.00
14. Regular truck, per mileUS$0.35US$0.00
Sheet sub-total, schedule 3US$0.70US$0.00

Schedule 4, traffic control (prices used only for additions or deletions)

Line and itemBidder ABidder B
15. Traffic control, sidewalk closure, per hourUS$45.00US$28.00
16. Traffic control, non-arterial street closure, per hourUS$45.00US$60.00
17. Traffic control, arterial street closure, per hourUS$45.00US$116.00
Sheet sub-total, schedule 4US$135.00US$204.00
Line and itemBidder CBidder D
15. Traffic control, sidewalk closure, per hourUS$150.00US$150.00
16. Traffic control, non-arterial street closure, per hourUS$150.00US$150.00
17. Traffic control, arterial street closure, per hourUS$150.00US$150.00
Sheet sub-total, schedule 4US$450.00US$450.00

Totals as printed

LineBidder ABidder B
Sub-total of the five schedulesUS$8,550.00US$8,232.00
Sales tax line (WSST)US$709.65US$683.26
Grand total base bidUS$9,259.65US$8,915.26
Discount or terms printed5 percent, net 10 days0 percent, net 0 days
LineBidder CBidder D
Sub-total of the five schedulesUS$11,430.70US$9,630.00
Sales tax line (WSST)US$948.75US$789.66
Grand total base bidUS$12,379.45US$10,419.66
Discount or terms printedNone listed0 percent, net 0 days