ArbNation Join free

Retiring rigging rope and slings: the inspection and discard rules in the codes

OSHA's sling standard lists the damage that takes a sling out of service, from 10 broken wires in one rope lay to powdered fiber between strands. The UK and New Zealand codes set the examination and removal duties for rigging lines and hardware.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. It draws on OSHA's sling standard, the Arboricultural Association's industry code, the New Zealand arboriculture code and one rope maker's technical bulletin. It is not training and does not teach the work. Inspection rules for climbing ropes are in inspecting climbing ropes and lines, and intervals across gear types are in gear inspection rules.

United States: OSHA 1910.184

OSHA's sling standard, 29 CFR 1910.184, covers slings made from alloy steel chain, wire rope, metal mesh, fiber rope and synthetic web. A competent person designated by the employer inspects the sling and all fastenings and attachments each day before use. Additional inspections happen during use where service conditions warrant. Damaged or defective slings are removed from service immediately.

For alloy steel chain slings the standard adds a thorough periodic inspection at intervals set by frequency of use, severity of service, nature of lifts and experience, and never greater than once every 12 months. The employer keeps a record of the most recent month of each thorough inspection. The inspection covers wear, defective welds, deformation and increase in length.

Conditions that remove a sling from service under 1910.184
Sling typeRemoval conditions listed
Wire ropeTen randomly distributed broken wires in one rope lay, or five broken wires in one strand in one rope lay. Wear or scraping of one-third the original diameter of outside individual wires. Kinking, crushing, bird caging or other distortion. Heat damage. Cracked, deformed or worn end attachments. Hooks opened more than 15 percent of the normal throat opening or twisted more than 10 degrees. Corrosion of the rope or end attachments.
Natural and synthetic fiber ropeAbnormal wear. Powdered fiber between strands. Broken or cut fibers. Variations in the size or roundness of strands. Discoloration or rotting. Distortion of hardware in the sling.
Synthetic webAcid or caustic burns. Melting or charring of any part of the sling surface. Snags, punctures, tears or cuts. Broken or worn stitches. Distortion of fittings.
Alloy steel chainChain size below the table minimum at any point of a link. Cracked or deformed master links, coupling links or other components. Hooks cracked, opened more than 15 percent or twisted more than 10 degrees. Heating above 1000 degrees F.

The standard also bars repaired or reconditioned fiber rope slings and bars the use of slings without legible identification markings.

United Kingdom: Arboricultural Association code

The Arboricultural Association's Industry Code of Practice for Arboriculture: Tree Work at Height (edition 2, May 2020) treats defective equipment as equipment to withdraw. Items that are defective or show symptoms that could lead to defects in use should be withdrawn from service. Equipment found defective in use or after inspection must be immediately withdrawn. The code allows for quarantine so a competent person can examine it. Defective equipment is labelled, and anything that cannot be repaired is indelibly marked to prevent inadvertent use or, if necessary, destroyed.

The code gives a lifespan rule: where a manufacturer specifies a lifespan, equipment outside the timeframe should be withdrawn from service. A lifespan may be exceeded only where the manufacturer has granted special dispensation that can be evidenced. Load ratings that are exceeded put the equipment or system out of service for thorough examination, after which it may be reintroduced or kept out. Its record list includes date into service, date of obsolescence and details of any alterations, modifications or repairs.

On slings and strops, the code sets a performance specification that includes a known safe working load when configured for use. On intervals, it states that under LOLER, equipment used for lifting people is thoroughly examined at least every 6 months and that other equipment, such as rigging equipment, must be thoroughly examined at least every 12 months. Regulation 9(3) of the Lifting Operations and Lifting Equipment Regulations 1998 covers lifting equipment exposed to conditions causing deterioration liable to result in dangerous situations. It sets at least every 6 months for lifting equipment for lifting persons and for an accessory for lifting. Other lifting equipment is examined at least every 12 months, or under an examination scheme.

New Zealand: Approved Code of Practice

WorkSafe New Zealand's Approved Code of Practice, Safety and Health in Arboriculture (November 2012), covers winches, wire ropes and accessories in section 3.4.6. Wire ropes, gears, chain drives and other parts are inspected under the manufacturer's instructions and removed from service if signs of excessive wear or damage are found. Tackle blocks, pulleys and their connecting links, chokers, slings and other means of attachment are inspected before use, with the same removal trigger. The section bars knots in any wire rope and eye-to-eye splices in pulling or lifting rope. Strops used to anchor winches or pulling blocks are at least 1.5 times the safe working load of the pulling rope.

A rope maker's retirement guide

A technical bulletin from a rope maker, revised June 2019, covers inspection and retirement of 12-strand high-modulus synthetic rope. It names seven common forms of damage: cut strands, compression, pulled strands, melted or glazed fiber, discoloration or degradation, inconsistent diameter and abrasion. It cites the Cordage Institute guideline CI2001-04 (2004) on fiber rope inspection and retirement criteria.

The bulletin recommends repair when damage is in localized areas and retirement when it covers extended areas. Two or more cut strands in proximity mean repair or retire. Compression is not permanent damage and is corrected by flexing the rope. For abrasion it prints a scale of 1 to 7. Steps 1 and 2 mean minimal strength loss, steps 3 to 5 mean significant loss with a call to the maker, and steps 6 and 7 mean severe loss and retirement. The maker states the figures are guidelines from its own testing.

Sources