Rigging over roofs and structures: what the codes say about span rigging and drop zones
The SafeWork NSW code, the UK Industry Code of Practice and TCIA's rigging manual each carry wording on drop zones and structures near the work, and the NSW code covers working from roofs. They define the terms and list controls.
Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.
The wording below is what the named codes and training bodies publish. It is not training and does not teach the work.
Three documents carry wording on rigging near buildings. They are the SafeWork NSW Tree works code of practice, the Arboricultural Association's Industry Code of Practice for tree work at height, and a TCIA article on span rigging drawn from its rigging manual. WorkSafe New Zealand's arboriculture code defines rigging but has no wording on roofs or structures.
Terms as the documents define them
| Term | Definition | Source |
|---|---|---|
| Rigging | The use of ropes, slings and mechanical devices to generate a mechanical advantage to safely lower limbs or sections of tree in a controlled manner, and to help minimise the impact on the surrounding environment | WorkSafe New Zealand arboriculture code, 2012 |
| Drop zone | An area designated for the entire tree to land when felling, or for branches, limbs or trunk sections to be deposited after cutting or lopping | SafeWork NSW code |
| Drop zone | An area where it is anticipated materials may fall and therefore people or property would be at significant risk from falling objects | Industry Code of Practice, UK |
| Exclusion zone | A large area from which people who are not workers are excluded | SafeWork NSW code |
| Work zone | An area where hazards could be met or created, which the work team but not the public may enter | Industry Code of Practice, UK |
| Span rigging | Rigging in which the load travels away from the removal tree through the air across a span, so it can clear obstacles or cover distance | TCIA |
| Speed line | A tensioned line angling from a high anchor in the removal tree or an adjacent tree, down which cut pieces slide away from the tree | TCIA |
| Vertical speed line | A static line run down the side of the trunk, so pieces drop straight down to avoid targets just outside the landing zone | TCIA |
Houses and structures in the drop zone
The SafeWork NSW code notes that where houses or other structures that may contain people sit inside exclusion zones, steps must be taken to control the associated risks. It sizes a drop zone by risk assessment. One of its listed factors is the chance that tree material deflects off branches, roots, structures, hard surfaces or equipment.
The UK code sizes each zone individually and allows a change only after the factors behind the original size are reassessed. It adds that a drop zone may move many times in one job. The team must be told each time, and the code says ideally this is documented. The extent of the drop zone must be clear to anyone in the work zone, and the code names signs, site features, canopy dripline or supervision as ways to show it.
People beneath the load
The NSW code says that at no time should a person be permitted to walk or be positioned under a suspended load. Workers must not enter the drop zone while the tree or tree material is being felled or dropped. When material or equipment is being lowered, they must not enter until it is safe to do so. Before timber is cut, dropped or lowered, the climber gives clear warning. Ground workers acknowledge it and clear the drop zone before the operation proceeds.
The UK code lists what a rigging operator must be able to do. That covers identifying the drop zones, estimating the mass of logs and crown sections, and calculating expected peak forces. It adds selecting compatible components and understanding the strength lost to knots in cordage. It also requires equipment capable of withstanding the anticipated loads with an appropriate margin of safety.
Load limits appear in two documents. The NSW code lists ropes, cables and winches rated for the expected loads. The New Zealand code says line pull shall not exceed the safe working load of the rope or its accessories, and sets that load at one-sixth of breaking strength for arboricultural operations.
Working from a roof
Section 7.3 of the NSW code covers reaching trees from roofs such as carports and garages. It lists controls to be considered:
- A risk assessment covering the way onto the roof, the strength of the roofing and the risk of falls
- Fall prevention such as guard railing or scaffolding, then travel restraint, then fall arrest where the earlier options are not reasonably practicable
- Control of risks to occupants entering the area directly below the access and work areas
- Roof material that is structurally sound and strong enough for the people and materials on it
- A safe way to get workers and tools such as chainsaws onto the roof and back to the ground
- A drop zone that takes in structures such as windows, which cut material may strike when it bounces back
- A communication system between ground workers and roof workers
- Control of material falling into neighbouring properties
- No work in inclement weather, excessive glare or high winds
The code states that brittle or fragile roofs should not be used to access or work on trees. It singles out brittle asbestos roofs, because of the risk of falling through and of friable asbestos particles being released.
Span rigging as TCIA describes it
TCIA's article calls span rigging a category of methods that protect property and landscape and let pieces clear obstacles. It names speed-line rigging, with one line, and load transfer or basket rigging, with two lines. The article treats a roof as one such obstacle: where significant tension is needed to gain clearance over a roof, lighter pieces are loaded.
The article also records the loads these systems put on the tree. Systems that move pieces horizontally, especially from a high anchor, raise the bending moment on the anchoring tree. A back stay, or two, is listed for larger, longer spans. It warns that dumping heavy weights into a tensioned line can tear it off the anchor with explosive force and send metal components airborne. The speed of a piece depends on the line angle, and the article says the angle is easy to underestimate. Crew members stay out of the zone of travel, it adds.
Sources
- SafeWork NSW, Tree works code of practice, commenced March 27, 2026, sections 3.5, 7.3 and 8.1, read October 16, 2026
- Arboricultural Association, Industry Code of Practice for Arboriculture: Tree Work at Height, second edition, May 2020, read October 16, 2026
- TCIA, Additional Rigging Systems, TCI Magazine, December 1, 2021, from Best Practices for Rigging in Arboriculture, 3rd edition, read October 16, 2026
- WorkSafe New Zealand, Approved Code of Practice for Safety and Health in Arboriculture, November 2012, glossary and section 3.4.6, read October 16, 2026