Trees on levees and dams: the Corps of Engineers vegetation guidelines in EP 1110-2-18

The Corps of Engineers keeps a vegetation-free zone around levees, floodwalls and dams: 8 feet high and 15 feet beyond each side at the minimum. Dams get larger zones, and the minimum cannot be reduced without a formal variance.

Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.

This page reports what the official source says. It is not legal advice: ask the office named here. The source is Engineer Pamphlet 1110-2-18, Guidelines for Landscape Planting and Vegetation Management at Levees, Floodwalls, Embankment Dams, and Appurtenant Structures, dated May 1, 2019, plus a federal regulation and a Federal Register notice.

Where the pamphlet comes from

EP 1110-2-18 republishes Engineer Technical Letter 1110-2-583 of April 30, 2014. The foreword says the conversion was formatting only, with no policy or substantive changes. The Corps did it because the letter was due to expire on April 30, 2019, while the review ordered by section 3013 of the Water Resources Reform and Development Act of 2014 was still running. The review covers whether federal levee vegetation policy fits all regions.

The vegetation-free zone

Paragraph 2-2 defines the zone as a three-dimensional corridor around all levees, floodwalls, embankment dams and critical appurtenant structures. It applies to all vegetation except grass. Its main purpose is access for inspection, maintenance, monitoring and flood fighting, including room to build temporary flood structures.

Minimum vegetation-free zone for levees, floodwalls and dams, paragraph 2-2
DimensionMinimum
Height of the corridor8 ft, measured vertically from any point on the ground
Width of the corridorThe width of the levee, floodwall or dam, with its critical appurtenant structures, plus 15 ft on each side from the outer edge of the outermost critical structure
Planting bermThe 15 ft is measured from where the top of the berm meets the levee section

No vegetation other than approved grasses may enter the zone, with two exceptions. Tree trunks are measured to their centerline, so half of a trunk may sit inside the zone. Newly planted trees are also allowed if their crowns can be expected to grow or be pruned clear of the zone within 10 years.

The minimum dimensions cannot be reduced without a formal variance. Where the project's real estate interest is narrower than 15 ft, the zone is the widest the interest allows. The project design team may call for a larger zone, and paragraph 2-3 recommends a vegetation-management zone beside the free zone as an alternative to enlarging it.

Roots and overturning

Paragraph 2-4 gives the zone a second job: distance between root systems and the structure. It names two risks: piping and seepage from root penetration, and structural damage from a wind-driven tree overturning. The pamphlet says root size and numbers fall off with distance from the trunk, and that the hole and disturbed earth from an overturned tree usually run 6 to 12 ft in radius. It calls the 15 ft zone a zone of reduced root impact, not a root-free zone.

Paragraph 2-5 sets root-free zones for structures critical to the system: levees, floodwalls, embankment dams, seepage berms, seepage drains, toe drains, pressure relief wells and cut-off trenches. Root barriers may add assurance but are not a substitute for distance, and must not slow groundwater or seepage flow. Paragraph 2-6 encourages shrub willows (Salix) riverward of the free zone to slow currents and wave action.

Floodwalls

The floodwall paragraphs say overturning trees can damage walls and that large roots can jack concrete or work into wall joints. The factors listed include distance between tree and wall, species with a low chance of breaking or overturning, monitoring of hazard trees, and intervening obstacles that would reliably stop a falling tree. Where other factors are unreliable, the pamphlet gives a minimum distance of one-half of the mature tree height as an example.

Embankment dams

Paragraph 3-4 quotes the Association of State Dam Safety Officials: tree and woody-vegetation penetrations of earthen dams have caused serious structural deterioration and distress that can end in failure. It names five vegetation-free areas.

  • The dam or the dam-toe area.
  • Areas in or around seepage monitoring systems, or critical downstream areas under continuous seepage watch.
  • Groin abutments and the areas next to them.
  • Spillways and spillway channels, including slopes and approaches.
  • The outlet-works discharge channel.
Minimum vegetation-free zones at dams, paragraph 3-4
Part of the damMinimum zone
Embankment, dry reservoirThe whole embankment surface, upstream impervious blankets, and upstream and downstream areas within 50 ft of the embankment toe
Embankment, normal poolFrom the upstream toe or the upstream limit of the blanket to at least 50 ft from the downstream toe
Abutments15 ft horizontally beyond the embankment and abutment contact line
SpillwaysThe spillways and channels, with slopes and approaches
Outlet channelsThe whole outlet channel, headwalls and wingwalls, and 50 ft from the top of the bank

The pamphlet says free zones must, when dry, be mowed to 3 to 6 inches whenever the grass reaches 12 inches, and that the maximum height of grasses must be 12 inches.

Variances and the federal regulation

A 2012 Corps notice in the Federal Register (77 FR 9637, February 17, 2012) proposed a revised process for requesting a variance from the vegetation standards for levees and floodwalls. The process rests on section 202(g) of the Water Resources Development Act of 1996. The notice was dated February 7, 2012 and opened a comment period to April 17, 2012. It quotes the Act's aim of "a coherent and coordinated policy for vegetation management for levees" that addresses regional variation.

Its policy letter says deviation from the national standards is permitted only through an approved variance. A variance preserving, protecting or enhancing natural resources must be the only reasonable means to comply with environmental or cultural law, protect Tribal rights, or address a unique environmental consideration such as sensitive species. Regional variances are not issued, and variances are weighed for individual levee systems. The letter excludes embankment dams from the variance policy. It cites an earlier edition of the Corps letter, ETL 1110-2-571 of April 10, 2009.

33 CFR 208.10 sets maintenance and operation rules for local flood protection works. Paragraph (a)(5) says no improvement may pass over, under or through the walls and levees, and no excavation or construction may occur in the project right-of-way, without the District Engineer first finding it will not harm the works. Paragraph (b)(1) calls for removal of wild growth and, where practicable, planting of willows or other suitable growth on areas riverward of levees.