When a utility removes private trees: Maryland, Oregon and Electricity Act 1989 rules
Maryland requires a utility to contact the owner before it removes a residential tree. Oregon's clearance rule has no payment or replanting clause, while the Electricity Act 1989 ties a felling notice to the occupier's reasonably incurred expenses.
Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. Three texts are quoted closely: Maryland's COMAR 20.50.12.09, Oregon's OAR 860-024-0016 and paragraph 9 of Schedule 4 to the Electricity Act 1989.
Maryland: COMAR 20.50.12.09
COMAR 20.50.12.09 sets minimum vegetation management requirements for Maryland electric utilities. Its scope clause says the requirements apply to the extent not limited by contract rights, property rights, or any controlling law or regulation of a unit of State or local government.
Section D covers notice. A utility must make a reasonable attempt to notify the owner or occupant of every property where cyclical, planned work is to be done. Notice satisfies the rule when it comes at least 7 days, but not more than 120 days, before the work. A bill insert alone does not count.
For all tree removals readily identified on residential properties, section D(4) says the utility must proactively contact the customer or owner to discuss the removal before the work. Section D(5) requires an option for direct communication with a utility vegetation management representative within 7 business days.
Tree work on energised plant is held to the standards for Maryland Licensed Tree Experts. A utility must also record each case where it seeks to remove a tree or limb but cannot, because permission or cooperation is not obtained. Among the factors that set the extent of work is acceptance by the property owner where the utility lacks legal rights to do the work.
The text holds no clause on payment to an owner or on replacement planting.
Oregon: OAR 860-024-0016
Oregon's rule on minimum vegetation clearance requires each operator of electric supply facilities to trim or remove vegetation to maintain clearances from supply conductors. It also requires trimming or removal of readily climbable vegetation. The rule defines vegetation as trees, shrubs and any other woody plants.
| Conductor voltage | Minimum clearance |
|---|---|
| Above 200,000 volts | 10 feet |
| 50,001 through 200,000 volts | 7.5 feet |
| 600 through 50,000 volts | 5 feet, or 3 feet if the vegetation is not readily climbable |
In the 600 to 50,000 volt band, limited small branches and new growth may intrude if they stay at least six inches from the conductor. The operator must weigh voltage, location, configuration, conductor sag, and the growth habit, strength and health of the vegetation.
The rule holds no clause on payment to a landowner, replacement planting or arborist review of a removal.
The two published copies differ in layout. The public.law copy numbers the clearances as section (5) and has no definition of a cycle buster. The Cornell Legal Information Institute copy numbers them as section (4), adds a definition of cycle buster, and notes that the Commission may require an alternative vegetation management programme or specific trim cycles. Both print the same clearance figures.
Great Britain: Electricity Act 1989, Schedule 4, paragraph 9
Paragraph 9 applies where a tree is so close to an electric line or plant that it obstructs or interferes with the installation, maintenance or working of the line or plant, or is an unacceptable source of danger. The licence holder may give the occupier notice requiring the tree to be felled or lopped, or its roots cut back. The notice is subject to payment by the licence holder of the expenses the occupier reasonably incurs in complying.
Where the occupier is not the owner, a copy of the notice also goes to the owner. After 21 days without compliance or a counter notice, the licence holder may carry out the work. A counter notice within 21 days sends the matter to the Secretary of State. The Secretary of State may make an order and may determine any question about what expenses, if any, are to be paid.
Where the licence holder uses these powers, it must work to good arboricultural practice and do as little damage as possible to trees, fences, hedges and growing crops. It must remove felled trees, lopped boughs and root cuttings as the owner or occupier directs, and make good any damage to the land. The paragraph defines a tree to include any shrub.
Sources
- Maryland Division of State Documents, COMAR 20.50.12.09, Vegetation Management Requirements, read October 19, 2026
- Oregon Public Utility Commission, OAR 860-024-0016, Minimum Vegetation Clearance Requirements, public.law copy accessed May 26, 2025, read October 19, 2026
- Oregon Public Utility Commission, OAR 860-024-0016, Cornell Legal Information Institute copy, amended September 22, 2022, read October 19, 2026
- UK Parliament, Electricity Act 1989, Schedule 4, paragraph 9, legislation.gov.uk, up to date to October 19, 2026, read October 19, 2026