ArbNation Join free

What a rigging kit contains: the lists in syllabuses and codes

None of the three codes below publishes a packing list for a rigging bag. The UK industry code, the SafeWork NSW code and the WorkSafe NZ code each name the same families of gear: rope, lowering devices, blocks, slings and connectors.

Checked against the sources at the bottom of this page on October 21, 2026. Rules, fees and pay change: the source has the last word.

This page draws on three codes of practice: the UK Industry Code of Practice for Arboriculture on tree work at height, the SafeWork NSW Tree works code and the WorkSafe New Zealand arboriculture code. It is not training and does not teach the work.

The UK industry code: equipment categories

The Industry Code of Practice for Arboriculture: Tree Work at Height, Edition 2, published May 2020, handles equipment in section 3.10 and gives each category a performance specification. The categories that bear on rigging kit, in the code's own order, are below. The anchorage and rope entries are written for personal fall protection systems.

CategoryWhat the code specifies
AnchorageTemporary anchor devices such as tape slings and cambium savers, with a minimum breaking strength of at least 18 kN, and artificial anchors such as machinery and vehicles
ConnectorsLocking mechanism to prevent inadvertent opening, major-axis loading, and a minimum breaking strength of at least 22 kN
Rope and friction cordRope the operator ascends, moves around the tree or descends on: when new, minimum breaking strength of 15 kN with a termination and 22 kN without one. Splices formed only by the manufacturer or with its consent
Lowering devicesA tube or bollard that wraps rope to create friction. Rated for the anticipated loads, including dynamic loading in rigging, and compatible with rope diameter
Pulleys, blocks and trolleysSheave diameter compatible with the rope, cheek plates that prevent inadvertent opening, sheave efficiency suited to the job
Slings and stropsTextile components in many sizes. The safe working load must be known, and the material must suit the use, since high modulus fibres can be stronger for their weight but less abrasion-resistant
RodsAttachments fixed as the manufacturer defines, with length-adjustable rods able to be secured in position
Personal protective equipmentItems worn by the user, such as helmet, gloves, boots, trousers, ear and eye protection

The code also lists principles of selection that apply to every item. They include how and where the item is used, compatibility with other components, correct alignment so items are not cross-loaded, strength and loading, wear rates, and resistance to UV, chemicals, abrasion, resin and sap. Load ratings may be a safe working load or a working load limit. The code says ratings should not be exceeded, and an item that goes over its rating should leave service for a thorough examination.

Section 3.3.5.3 lists what a rigger must be able to do. The list covers identifying drop zones, estimating log and crown section mass, calculating expected peak forces and selecting compatible components, understanding strength loss from knots in cordage, and cutting accurately.

The SafeWork NSW code: ropes, pulleys, slings and shackles

The SafeWork NSW Tree works code of practice, in force from March 27, 2026, names ropes, pulleys, slings and shackles as the equipment commonly used in pruning and removals. Its chapter on lowering adds lowering devices, a separate tag line, a friction drum for heavy loads and a diversion pulley where the risk assessment calls for one.

The code says lowering equipment should be proprietary manufactured and load rated, with its rated strength determined before use. The rated strength should be shown by labelling on the equipment or its packaging, permanent labelling, the manufacturer's manual, or a lifting equipment register. Connection hardware such as shackles used with pulleys should be labelled with age and working load limit, and a karabiner or shackle should not be used in place of a pulley. A lowering system is only as strong as its weakest component. The climbing system rope should be separate from the lowering system rope, and lowering equipment should be inspected before, during and after each use.

The WorkSafe NZ code: the rigging definition and its tackle

The Approved Code of Practice for Safety and Health in Arboriculture, November 2012, defines rigging as the use of ropes, slings and mechanical devices to generate a mechanical advantage to safely lower limbs or sections of tree in a controlled manner. The code's felling section names wedges, block and tackle, rope and wire cable. Its section on winches, wire ropes and accessories names tackle blocks, pulleys, connecting links, chokers and slings.

  • The tackle blocks, pulleys, links, chokers and slings are inspected before use and withdrawn if worn or damaged.
  • Strops that anchor winches or pulling blocks must be at least 1.5 times the safe working load of the pulling rope.
  • Line pull must not pass the safe working load of the rope or its accessories, and for all arboricultural operations that load is one-sixth of the breaking strength.
  • A separate lowering line shall be attached to limbs that cannot be dropped safely or controlled by hand, and arborist climbing lines and lowering lines shall not be run through the same crotch.
  • The glossary defines a tool strop as a short line used to secure tools while aloft.

The code adds that no wire rope may be used unless the manufacturer or vendor has certified its breaking strength, knots are banned in wire rope, and eye-to-eye splices are not made in pulling or lifting rope.

Sources