ArbNation Join free

Climbing systems and technique: start here by question

Eight questions about climbing systems, each with what HSE, the Arboricultural Association and WorkSafe New Zealand publish on it and the ArboNation guides that go deeper.

Checked against the sources at the bottom of this page on October 15, 2026. Rules, fees and pay change: the source has the last word.

The named codes and training bodies are described here as published. It is not training and does not teach the work. HSE text is adapted from HSE pages published under the Open Government Licence v3.0.

New to climbing

HSE states that the Work at Height Regulations 2005 do not ban climbing work. Climbing on ropes and a harness is allowed only where a risk assessment supports it, safer equipment is not justified and the user has task-specific training that includes rescue. For the training each source names, see getting started in tree climbing.

Which system

HSE names two main climbing techniques. Work positioning, such as changeover climbing with a harness, friction knot and climbing line, is one. Rope access and positioning, such as footlocking or single rope technique, is the other. The ICoP uses its own pair, moving rope technique and stationary rope technique. For the terms compared, see climbing systems compared and SRS and MRS.

Hitches and devices

The ICoP gives separate headings to ascending devices, backup devices, connectors, rope adjustment devices and descending devices. WorkSafe New Zealand requires climbers to know how a friction hitch performs with other components and to receive adequate training before use. For more on each, see friction hitches, climbing devices by type and knee ascenders.

Knots

The New Zealand code lists the friction hitch under its climbing section: it moves freely up and down the climbing line. For the knots the codes and syllabi name, see knots arborists use.

Spurs

The ICoP describes climbing irons as a technique for ascent, descent and movement where the operator needs a secure, mobile connection with the stem. It calls spiking invasive, says it can do considerable damage to the tree, and says it is not a stand-alone technique. For each code's wording, see spurs and spikes.

Tie-in and anchors

HSE puts the system, where possible, on two anchor points that carry load, each strong enough for the climber, the work equipment and any foreseeable loading. In the New Zealand code the climber must be tied in while ascending and until back on the ground, with no more than 0.5 metres of slack in the climbing line. For other countries, see tie-in and second attachment rules and lanyard types.

Weather and conditions

The New Zealand code has the employer or person in charge suspend operations while high winds, wet weather, poor visibility or other adverse conditions make an operation dangerous. The ICoP puts avoiding weather that may jeopardise health and safety into the planning of work at height. For more, see climbing in bad weather and when climbing stops.

Rescue

HSE sets a minimum of two people on aerial work, with a ground team member equipped to rescue without delay. The New Zealand code puts a second person trained in aerial rescue on site for any climb above three metres. For rescue in full, see aerial rescue.

Sources