Lifting a climber in a crane basket: the personnel-lift rules
OSHA's crane rule on hoisting personnel, 29 CFR 1926.1431, sets a platform, a 50 percent capacity cap and a trial lift. The same subpart excludes tree trimming and tree removal work from its scope.
Checked against the sources at the bottom of this page on October 19, 2026. Rules, fees and pay change: the source has the last word.
The named codes and standards are described here as published. It is not training and does not teach the work.
The tree work exclusion in subpart CC
Subpart CC of OSHA's construction standards, 29 CFR 1926.1400, covers power-operated equipment that can hoist, lower and horizontally move a suspended load. Its scope names articulating cranes such as knuckle-boom cranes, mobile cranes, boom trucks and derricks. Personnel platforms appear in its list of attachments.
Paragraph (c) of section 1926.1400 lists exclusions. Item (13) is "Tree trimming and tree removal work". Other items exclude excavators, wheel loaders, backhoes and track loaders, even when they lift suspended loads with chains or slings. Section 1926.1431, described next, belongs to the same subpart.
Section 1926.1431, Hoisting personnel
Section 1926.1431 says its requirements add to the other requirements of the subpart and apply when one or more employees are hoisted. The section opens with a prohibition. Equipment may not hoist employees unless the employer shows that conventional means of reaching the work area would be more hazardous or not possible. The conventional means it names are a personnel hoist, ladder, stairway, aerial lift, "elevating work platform" and scaffold.
Employees hoisted this way must ride in a personnel platform. The section lists exceptions for drill shafts up to 8 feet in diameter, pile driving, marine transfer, and storage-tank, shaft and chimney work.
Equipment, platform and rigging figures
| Item | What the section sets |
|---|---|
| Set-up | Equipment level within 1 percent of level grade, on footing a qualified person has found firm and stable. Outriggers and stabilizers all extended and locked. |
| Capacity | Total load not above 50 percent of rated capacity for the radius and configuration. The proof test is the exception. |
| Equipment devices | On variable angle booms, a boom angle indicator and a boom hoist limiting device. Anti two-block device, and controlled load lowering that does not rely on the load line hoist brake. Free fall of the load line is prohibited. |
| Platform | Designed by a qualified person. Stays within 10 degrees of level. Supports its own weight and at least five times the maximum intended load. Guardrail, grab rail, overhead protection when needed, and rated capacity posted. |
| Rigging | Hooks that close and lock. Rigging hardware able to support at least five times the maximum intended load, and ten times where rotation resistant rope is used. Thimbles in wire rope sling eyes. |
| Trial lift | Unoccupied platform loaded at least to the anticipated weight, lifted to each work location before each shift in which personnel are hoisted. |
| Proof test | At each jobsite before hoisting employees, and after repair or modification: 125 percent of the platform's rated capacity, lowered under control and held at least five minutes. |
| Wind | Above 20 mph, sustained or gusts, a qualified person decides whether the lift can proceed. |
| Power lines | Hoisting personnel within 20 feet of a line up to 350 kV, or within 50 feet of a line over 350 kV, is prohibited, except work covered by subpart V. |
Work practices in the section
Section 1926.1431(k) covers the lift itself. Hoisting is slow and controlled, with no sudden movements. Occupants keep all parts of the body inside the platform. They do not stand on the rails or toeboard, and they do not pull the platform out of plumb.
Occupants must wear and use a personal fall arrest system attached to a structural member within the platform, except over water. No lifts may be made on the equipment's other load lines while people are hoisted, apart from pile driving. Travel with a person hoisted is prohibited, with exceptions for fixed rails and for cases where the employer shows there is no less hazardous way. The exception does not apply to rubber-tired equipment.
Where the platform has no controls, the operator stays at the equipment controls, on site and in view, for as long as the platform is occupied. A pre-lift meeting reviews the section's requirements. The operator, the signal person if one is used, the people to be hoisted and the person responsible for the task attend.
Before each lift, the platform is hoisted a few inches with people and tools aboard. A competent person inspects it for security and balance, and checks the hoist ropes and the attachment.
The ASME standards
The American Society of Mechanical Engineers (ASME) publishes B30.23, Personnel Lifting Systems, in a 2022 edition of 36 pages. ASME states that B30.23 may apply to hoisting and accessory equipment covered in certain volumes of the B30 series, used to lift, lower, hold or transport personnel in a platform. The platform hangs from wire rope or chain, or is mounted on a boom. ASME adds that some B30 equipment does not allow lifting of personnel. The B30 volume for the hoisting equipment in question is to be consulted on whether B30.23 applies.
ASME B30.5, Mobile and Locomotive Cranes, is the 2025 volume for crawler, locomotive and wheel-mounted cranes with combustion engines or electric motors. Its scope excludes side boom tractors, wreck-clearance cranes, digger derricks, cranes used for energized electrical line service, knuckle boom cranes, trolley boom cranes and cranes of one ton rated capacity or less.
Sources
- US Code of Federal Regulations, 29 CFR 1926.1431 Hoisting personnel, electronic CFR, read October 19, 2026
- US Code of Federal Regulations, 29 CFR 1926.1400 Scope, applicability, and definitions, electronic CFR, read October 19, 2026
- American Society of Mechanical Engineers, B30.23 Personnel Lifting Systems, 2022, product page, read October 19, 2026
- American Society of Mechanical Engineers, B30.5 Mobile and Locomotive Cranes, 2025, product page, read October 19, 2026