Sidewalks, accessibility and street trees: PROWAG, the Willits settlement and Title II
The US Access Board's 2023 PROWAG final rule sets sidewalk width, grade, cross slope and protrusion limits. A Los Angeles notice shows the Willits settlement sending sidewalk repairs, and two street tree removals, through city approvals.
Checked against the sources at the bottom of this page on October 16, 2026. Rules, fees and pay change: the source has the last word.
This page reports what the official source says. It is not legal advice: ask the office named here. The sources are the Access Board's final rule, its technical requirements, a City of Los Angeles notice and a joint Justice and Transportation document on curb ramps.
Where PROWAG stands
The US Access Board issued its final rule on Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way, known as PROWAG, in the Federal Register on August 8, 2023. It is codified at 36 CFR Part 1190 and took effect September 7, 2023. The rule covers sidewalks, crosswalks and other pedestrian facilities that federal, state and local governments build or alter in the public right-of-way.
The Board states that the guidelines become enforceable once the Department of Justice and the Department of Transportation adopt them, with or without changes, as mandatory standards under the ADA. The same applies to the four agencies that set Architectural Barriers Act standards for the federal government.
The figures that shape a sidewalk
PROWAG Chapter 3 (R302) describes the pedestrian access route, the continuous path a sidewalk has to provide. The figures that decide how much room a street tree can have beside it are in the table below.
| Item | Reference | Requirement |
|---|---|---|
| Continuous clear width | R302.2 | 48 inches (1220 mm) minimum, not counting the width of any curb |
| Width at medians and refuge islands | R302.2.1 | 60 inches (1525 mm) minimum |
| Passing spaces | R302.3 | Where the clear width is under 60 inches, a 60 by 60 inch space at intervals of 200 feet (61 m) maximum |
| Grade inside a highway right-of-way | R302.4.1 | Not over 1:20 (5.0%), unless the adjacent street is steeper, when the route may follow the street grade |
| Cross slope outside a crosswalk | R302.5.1 | 1:48 (2.1%) maximum |
| Cross slope inside a crosswalk | R302.5.2 | 1:48 (2.1%) maximum at stop or yield control; 1:20 (5.0%) maximum at an uncontrolled approach and at a traffic control signal or pedestrian hybrid beacon; not over the street grade at midblock and roundabout crosswalks |
| Grade breaks | R302.6.1 | Flush |
| Changes in level | R302.6.2 | Up to 1/4 inch (6.4 mm) may be vertical; 1/4 to 1/2 inch (13 mm) beveled no steeper than 1:2; over 1/2 inch up to 6 inches at 1:12 (8.3%) maximum |
| Openings in the surface | R302.6.3 | No passage of a sphere larger than 1/2 inch (13 mm) |
A sidewalk panel lifted by a root usually creates a change in level. In the preamble, the Board acknowledges that panels shift over time through tree root growth, soil movement and other factors. It clarified the changes-in-level provisions in response to local governments that found the 1/2 inch limit hard to hold, and expects the clarified text to help jurisdictions plan for compliance through regular maintenance programmes.
Branches, shrubs and protrusion limits
The Board lists planted trees among the objects that can protrude into a pedestrian circulation path, with utilities, signs and street furniture. It states that regulated entities will have to meet the protrusion requirements when installing or permitting the installation of trees and other objects on or next to those paths.
The limits in R402.2 apply to objects whose leading edges sit more than 27 inches (685 mm) and less than 80 inches (2030 mm) above the walking surface. Those objects cannot protrude more than 4 inches (100 mm) horizontally into the path. The preamble gives low hanging tree branches as a hazard to pedestrians who are blind or have low vision. It adds that overgrown shrubbery can block a blind pedestrian who trails the edge of a sidewalk, or push a wheelchair user close to the roadway.
The Board cites the AASHTO pedestrian guide (2021), which recommends pruning trees and shrubs to keep walkways usable. It also states that state and local governments will be responsible for enforcing maintenance agreements that keep branches out of the path where the jurisdiction does not do the maintenance itself. In answer to a local government comment that the limits could raise landscape trimming costs, the Board notes that jurisdictions commonly manage the landscaping beside sidewalks already.
Title II and curb ramps
A July 8, 2013 technical assistance document from the Justice Department's Disability Rights Section and the Federal Highway Administration covers curb ramps under Title II of the ADA. It states that state and local governments have to give people with disabilities access to pedestrian routes in the public right-of-way.
The document reports that newly built or altered streets, roads and highways must have curb ramps or other sloped areas where a pedestrian walkway meets a curb, citing 28 CFR 35.151(i). Alterations include reconstruction, rehabilitation, resurfacing and widening. Filling potholes and similar maintenance are not alterations. Resurfacing counts as an alteration when it covers a street from one intersection to the next and adds material to the road surface, with or without milling. Resurfacing a crosswalk alone also triggers curb ramps at that crosswalk. The document states that the ADA does not require curb ramps where there is no pedestrian walkway with a prepared surface. It describes itself as informal guidance with no binding legal effect, which the Department may change.
The Willits settlement in a City of Los Angeles notice
The Willits case is U.S. District Court Case No. CV10-05782. The City of Los Angeles cites it in a Notice of Exemption filed with the California Governor's Office of Land Use and Climate Innovation on June 5, 2025, State Clearinghouse number 2025060201. The notice does not set out the settlement's terms.
The notice covers Sidewalk Repair Package No. 57 from the Bureau of Street Services (StreetsLA), at 13 sites across the city. It says the repairs are carried out under the City's obligations under the Willits Settlement Agreement. The scope is limited to removing the specific ADA access barriers identified by a resident or requestor with a disability, plus adjacent work for that purpose.
- The project includes removing two street trees, one at Site 2868 and one at Site 6646. The notice says both need to go as part of the sidewalk repair.
- Removal needs a separate discretionary approval from the Bureau of Street Services, Urban Forestry Division, or the Board of Public Works.
- The Bureau of Engineering conditionally approved the project on May 7, 2025, contingent on approval of the tree removals.
- StreetsLA found the project exempt from the California Environmental Quality Act and approved the tree removals on May 15, 2025.
- The stated exemption is Public Resources Code section 21080.25, for city forces-only work on a maintained, repaired or replaced pedestrian facility approved between January 1, 2023 and December 31, 2029.
The notice shows the sequence in this one package: an access barrier, an engineering approval, then a separate urban forestry decision on each tree. The notice gives no general test for removing or keeping a tree. Los Angeles, Seattle and New York City list their own options for fixing sidewalks around trees.
Where the offices sit
- The Access Board's Office of Technical and Information Services answers questions on the guidelines; the Federal Register notice lists Scott Windley and (202) 272-0025.
- The Justice Department and the Department of Transportation share enforcement of Title II for the public right-of-way, according to the 2013 document.
- The City of Los Angeles notice names Hector Banuelos, Street Tree Superintendent I, at (213) 847-3110 as the lead agency contact.
Sources
- US Access Board, Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way, final rule, 88 FR 53604, August 8, 2023, read October 16, 2026
- US Access Board, PROWAG R3: Technical Requirements, read October 16, 2026
- City of Los Angeles, Sidewalk Repair (StreetsLA) Package No. 57, Notice of Exemption, SCH 2025060201, posted June 5, 2025, read October 16, 2026
- US Department of Justice and Federal Highway Administration, Joint Technical Assistance on curb ramps when streets are altered through resurfacing, July 8, 2013, read October 16, 2026